Download Print this page

Sleipner SE-IP40 Installation Manual

Dc electric thruster
Hide thumbs Also See for SE-IP40:

Advertisement

Quick Links

Installation Guide
For DC Electric Thruster Models
SE-IP30, SE-IP40
DOCUMENT ID:
5453
REVISION:
17
DATE:
2024
EN
LANGUAGE:

Advertisement

loading
Need help?

Need help?

Do you have a question about the SE-IP40 and is the answer not in the manual?

Questions and answers

Summary of Contents for Sleipner SE-IP40

  • Page 1 Installation Guide For DC Electric Thruster Models SE-IP30, SE-IP40 DOCUMENT ID: 5453 REVISION: DATE: 2024 LANGUAGE:...
  • Page 2 Failure to follow instructions within this document will render all warranties given by Sleipner Motor as VOID. Warnings and situations requiring extra caution are outlined in the documentation. Take extra consideration when warnings are outlined.
  • Page 3 If local regulation requires any electrical work to be performed by a licensed professional, seek a licensed professional. • When planning the installation of Sleipner products, ensure easy access to the products for future service and inspection requirements. For Sleipner thruster systems: MC_0425 •...
  • Page 4 Maximum tunnel wall thickness 0,24 0,24 *Valid for SE IP & SEP IP Propeller position will vary with each thruster model Single Propeller The gear leg/ propeller(s) must never extend out of the tunnel Tunnel centre line MG_0311 SE-IP30, SE-IP40 5453 2024...
  • Page 5 48 kg / 105 lbs (12V) 40 kg / 88 lbs (10.5V) 2.2 kW / 3hp 10 kg / 22 lbs * SE and SE-IP are measured at motor terminals when the thruster is operated for on/off thrusters SE-IP30, SE-IP40 5453 2024...
  • Page 6 (NB: This can be overlooked depending on the installation methods defi ned in this manual.) Pivot point important Lowered rotation power performance Stronger rotation power performance Water line Ø min 1/4 Ø (Recommended) min 1/4 Ø (Recommended) MG_0001 SE-IP30, SE-IP40 5453 2024...
  • Page 7 The gear leg/ propeller(s) must prevent a circular water vacuum Increase tunnel length to protect never extend out of the tunnel cavity between the propeller and the propeller from water forces the hull of the boat. when high-speed cruising. MG_0048 SE-IP30, SE-IP40 5453 2024...
  • Page 8 This installation is being used by some of the world’s largest sail boat builders and has proven to give little to no speed loss during normal cruising. This can also be an installation method for flat bottomed barges to avoid extremely long tunnels and large oval tunnel openings in the hull.   Pos. A Pos. B MG_0004 SE-IP30, SE-IP40 5453 2024...
  • Page 9 +) the extended deflector/ spoiler must provide protection from the front while underway and the bottom. In the event when the boat is traveling at high speeds it will commonly pound upon the water surface. High water force while underway from wave contact MG_0003 SE-IP30, SE-IP40 5453 2024...
  • Page 10 This “free” extra thrust in optimal installations be 30 - 40% of the total thrust. (NB: A Sleipner thruster propeller does not produce cavitation at working speed. Therefore, any cavitation and cavitation noise in the tunnel will be caused during improper tunnel installation.)
  • Page 11 (NB: Ensure gaps between the tunnel and the hull are completely fi lled with resin/ fi breglass. In areas where you can not access to make layers of resin/ fi breglass, a resin/ fi breglass mixture must be used in that area.) 8 x layers of fiberglass and resin 8 x layers of fiberglass and resin MG_0005 SE-IP30, SE-IP40 5453 2024...
  • Page 12 You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not waterproof without these applications outside. (NB: All original Sleipner tunnels are fully waterproof when delivered except in the areas where you have cut and bonded it to the hull.)
  • Page 13 Stern Tunnel Installation MC_0003 For Stern Thruster installation please refer to the supplied manual in your Sleipner product delivery Installation Guide For DC Electric Thruster Models SE80, SE100, SE120, SE130, SE150 Stern Thruster SLEIPNER AS DOCUMENT ID: 222222 REVISION: P.O. Box 519...
  • Page 14 SE20/110S SE25/110S SE/SEP/SE IP/SEP IP 30/125S2 SE/SEP/SE IP/SEP IP 40/125S2 SE/SEP/SE IP/SEP IP 30/140S SE/SEP/SE IP/SEP IP 40/140S Stern SE/SEP/SE IP/SEP IP 50/140S SE/SEP/SE IP/SEP IP 60/185S2 STARBOARD Drill centre hole first Smooth surface area MG_0612 SE-IP30, SE-IP40 5453 2024...
  • Page 15 Bolt plate Motor bracket The template must sit on the bracket surface with the bolt plate within the measurement cutout Bolt plate Bolt plate Motor bracket MG_0613 SE-IP30, SE-IP40 5453 2024...
  • Page 16 10. Fasten the gear leg and the motor bracket with the bolts provided. Tighten to torque as shown. Apply MS Polymer sealant or equal to both sides of the gasket. Do not apply sealant to the bolt holes. Motor bracket Tunnel Diameter /110mm /125mm Nm lb/ft mm inch Fasten 8,85 13,3 MG_0614 SE-IP30, SE-IP40 5453 2024...
  • Page 17 Insert the washer to the end of the shaft spline. Fasten with the propeller lock-nut. Apply anti-fouling to the gear leg and propeller. Do not apply anti-fouling to any rubber elements of the gear leg or anodes. Shaft Spline Propeller Washer Anti-fouling Holding Screw FASTEN MG_0050 19 Nm 14.014 lb/ft SE-IP30, SE-IP40 5453 2024...
  • Page 18 On completion of operations, the cover must be removed before operating the thruster.) Turn gear leg shaft so the motor coupling fits into the slots. Drive Pin > 30° Motor support FASTEN (18 Nm) (13.28 lb/ft) MG_0066 SE-IP30, SE-IP40 5453 2024...
  • Page 19 Wiring Diagram chapter for an overview. Sleipner offers both manual main switches and Automatic Main Switches (AMS). Sleipner AMS is controlled by the control panel in addition to the option of manual operation. Turning on the control panel also turn on the automatic main switch. When the control panel is turned off the automatic main switch is turned off.
  • Page 20 2 x 95 2 x 95 2 x 120 2x 120 40/125S 315 A SAE: 570 ANL 250 40/140 EN: 520 2 x 2/0 2 x 3/0 2 x 3/0 2 x 4/0 2 x 4/0 SE-IP30, SE-IP40 5453 2024...
  • Page 21 Manual Main Switch IP Thruster BATTERY The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. 4-wire cable ANL Fuse Fuse Manual Main Switch BATTERY IP Thruster MG_0592 SE-IP30, SE-IP40 5453 2024...
  • Page 22 Fuse 5A The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation. Automatic Main Switch 5-wire cable ANL Fuse Fuse BATTERY Fuse 5A IP Thruster 4-wire cable MG_0036 SE-IP30, SE-IP40 5453 2024...
  • Page 23 Control Panel Installation MC_0398 For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed. Installation Guide Control Panel SLEIPNER MOTOR AS DOCUMENT ID: REVISION: P.O. Box 519 N-1612 Fredrikstad DATE: Norway www.sleipnergroup.com LANGUAGE:...
  • Page 24 Correct drive direction as per control panel: ..............................The compartment for the thruster has been isolated from general bilge water and has no obvious or suspected risks for flooding: .................................................................................................................................. Other comments by installer: ........................................................................................................................SE-IP30, SE-IP40 5453 2024...
  • Page 25 11. This warranty gives you specific legal rights, and you may also have other rights which vary from country to country. Patents MC_0024 At Sleipner we continually reinvest to develop and offer the latest technology in marine advancements. To see the many unique designs we have patented visit our website www.sleipnergroup.com/patents SE-IP30, SE-IP40...
  • Page 26 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE-IP30, SE-IP40 5453 2024...
  • Page 27 Notes MC_0037 ..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................SE-IP30, SE-IP40 5453 2024...
  • Page 28 © Sleipner Group, All rights reserved The information given in the document was right at the time it was published. However, Sleipner Group cannot accept liability for any inaccuracies or omissions it may contain. Continuous product improvement may change the product specifi cations without notice.

This manual is also suitable for:

Se-ip30Se40Se30