Download Print this page

Charge Rate - AT&T Bell System Plant Series Installation Manual

Coin telephones single slot
Hide thumbs Also See for Bell System Plant Series:

Advertisement

SECTION
506-101
·201
s.
SETTING
TOTALIZER
CHARGE RATE
6.01
The
totalizer,
mounte
d on
the
s ide
of
co
in
chute.
steps
orne i
ncrement
ro.r
e
ach
5
Cf.;!nt
s
deposite
d.
A
nickel
equals
one,
dime equa
ls
two,
and a
quane
r
equals
five
increments
.
Use
extreme
care wlren
se
tting
total·
izer.
Auoid
damaging pawl
and
spring
pile-ups.
(See
f
ig.
8.)
6.02
Two
paper
clips,
or
equivalent,
are used
to
set the totalizer.
6.03
To
set
totalizer:
(1)
Rotate shaft In
the proper direction
(from
bottom
to
top)
until s
prings
T
2
rest in
de-
pression on
shaft
(l'lg. 8).
SPR
I
NG
PILE·
UPS
Tl
c
(2)
Release
plastic
latch
reset (Fig.
9)
and
check
s prings
Tl.
(a)
If
springs
Tl
are
not operated.
pro-
<.:t!ed wJth [he
normal sequence of
instructions.
(b) If
springs
Tl
are
found to
be
operated.
omlt
insuuction
3;
to
How instructions
4,
5,
a.nd
6;
omit Instruction
7,
and
then
proceed
in
the
normal
sequence of
in-
Slr.uc ttons.
(3)
Rotate s
haft
in
p
ro
per
direction until
springs
T
l op
erate as
lndlcated
by
a
movcm~nt
of
tbc
p
1 a
a
t 1
c latch
reset
(Fig. 9).
(4)
Do nor
al
low rhe
shaft
to
move. lnserc
one
ol
the
p.aper
c lips
into
bole located
near
the
onset
on
r ight
end
of shaft.
(See
rig. 9.)
SHAFT
DEPRESSION
Fig.
8.
Totalizer
Spring
Pile·ups

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bell System Plant Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Bell system 1a series