DEFlATION
1. Plug in the AC power cord into an AC electrical outlet. See Fig (1).
2. Slide the inflate/deflate selection switch down into the deflation position (
the air chamber selection dial to "Both air chambers" mark (
chambers simultaneously. See Fig (7.1-7.2).
To adjust the firmness see "INFLATION" section.
3. When all the air is removed from the airbed, turn the
air chamber selection dial back to the (
(you will feel a click) and the pump will turn off.
Disconnect the AC power cord from the wall socket, place
it inside the cord compartment.
4. With the airbed fully deflated begin rolling the airbed
from the end opposite of the pump towards the end
where the pump is located. See Fig (8).
STORAgE INSTRUCTIONS
1. Deflate the airbed following the "DEFLATION" instructions.
2. Make sure the airbed is clean and dry.
3. Lay the airbed flat with the sleeping surface facing upwards and follow the folding steps
on Figs (9 - 13). Fold the airbed loosely and avoid sharp bends, corners and creases
which can damage the airbed.
FIg (9)
4. Place the airbed inside the storage bag and store in a dry place.
©2022 Intex Marketing ltd. - Intex Development Co. ltd. - Intex Recreation Corp. All rights reserved/Tous droits réservés/Todos los derechos
reservados/Alle Rechte vorbehalten. Printed in China/Imprimé en Chine/Impreso en China/gedruckt in China.
®™ Trademarks used in some countries of the world under license from/®™ Marques utilisées dans certains pays sous licence de/Marcas registradas
utilizadas en algunos países del mundo bajo licencia de/Warenzeichen verwendet in einigen Ländern der Welt in Lizenz von/Intex Marketing ltd. to/à/
a/an Intex Development Co. ltd., Hong Kong & Intex Recreation Corp., P.O. Box 1440, long Beach, CA 90801 • Distributed in the European Union
by/Distribué dans l'Union Européenne par/Distribuido en la unión Europea por/Vertrieb in der Europäischen Union durch/Intex Trading B.V., Ettenseweg
46, 4706 PB Roosendaal – The Netherlands • Distributed in the UK by Unitex Service (UK) limited, 21 Holborn Viaduct, london EC1A 2DY, UK.
www.intexcorp.com
READ AND SAVE THESE INSTRUCTIONS
(22PO) AP619MP2 ELECTRIC PUMP ENGLISH 4.875" X 7.25" 12/15/2021
619MP2
FIg (7.1)
) position
FIg (11)
FIg (10)
Page 5
619MP2
). This will deflate both
FIg (12)
22
PO
) and turn
FIg (7.2)
FIg (8)
FIg (13)
Need help?
Do you have a question about the FastFill AP619MP2 and is the answer not in the manual?
Questions and answers