If you are at all unsure of anything, please contact us. All products where appropriate supplied by Airparx and Airquee will conform to the latest standards. Some inflatables contain elements that are not covered under the EN14960:2019 inflatable standard, however, we use this standard as best practice to ensure that any relevant sections of that standard that can be applied, do get applied.
European manufacturing facility to maintain its quality at the highest levels. Airparx and Airquee inflatables are all made in our own factory, from the highest quality fire retardant reinforced PVC coated fabric, manufactured to own our specifications. Constructed from polyester or nylon weave, thickly coated on both sides with PVC, resulting in an extremely robust material with a cape or gloss finish.
Unauthorised modifications could void the warranty. Airparx and Airquee is not responsible for any damage to the product, or any injuries produced to anyone arising out of such unauthorised action.
OPERATIONAL GUIDELINES AND RULES OF PLAY • Only users of similar age or size should use the air mountain at the same time. • An operator or attendant must be present to ensure users use the inflatable as intended.
This manual covers how to move, unroll, attach the fan and set up the product. After the setup of the inflatable there are a couple of specific elements needed for the Air Mountain. Initial inflation of the mountain part may be slow. The air will take time to inflate this part.
If the entire inflatable begins to lift off the ground, then you have too much pressure in the mountain and you should remove the sandbags to allow air to escape. • The above would normally only occur if the air mountain has not been used for a while and the pressure has had time to build up. •...
Regulations 1998 (PUWER). Customers are advised to check the requirements of the laws within their country. Airparx and Airquee can carry this out with its team of mobile inspectors. A certificate will be issued confirming the result of the safety inspection and test. If repair or replacement should be deemed necessary, you will be advised accordingly.
If any new, untrained staff are hired, the controller/operator should ensure their adequate training which must include: • The method of operating the device. • Safe methods of assembling/dismantling any part of the inflatable where necessary. www.airquee.com Page 10 of 13...
The electrical sockets and cables are properly connected and are not chafed nor damaged. The inflatable is completely free of users and NO ONE IS STANDING ON THE INFLATABLE. All deflation zips are closed. www.airquee.com Page 11 of 13...
Page 12
The air outflow tube is straight and unobstructed. The sandbags are correctly placed. TRIAL RUNS ARE PERFORMED ON ALL THE REQUIRED PARTS, before allowing users to enter the play area. The park is clean and tidy. www.airquee.com Page 12 of 13...
Page 13
Manual. It is the user's responsibility to determine whether there have been any such updates or amendments. Neither Airquee nor any of its directors, officers, employees, or agents shall be liable in contract, tort or in any other manner whatsoever to any person for any loss, damage, injury, liability, cost or expense of any nature, including without limitation incidental, special, direct or consequential damages arising out of or in connection with the use of the Manual.
Need help?
Do you have a question about the Air Mountain and is the answer not in the manual?
Questions and answers