Download Print this page

Setup And Operation - TECshow MINI BUBBLE MASTER II User Manual

Compact bubble machine

Advertisement

5. SETUP & OPERATION
Position the QTFX-B2 on a stable surface or
mount upright using the integral bracket.
Pour bubble fluid directly into the front open
tank, taking care not to spill on electrical parts of
the machine.
Connect the IEC mains plug.
Switch power on at the rear panel to begin
producing bubbles.
Switch off to stop producing bubbles
Disconnect from mains when usage is finished
Empty remaining bubble fluid back into container
or dispose as appropriate.
Rinse fluid tray with water and wipe clean before
next use.
English Version | Tecshow BUBBLE MASTER MINI II
P. 5

Advertisement

loading
Need help?

Need help?

Do you have a question about the MINI BUBBLE MASTER II and is the answer not in the manual?

Questions and answers