Download Print this page

Advertisement

Quick Links

Phone number: 01945 410950
support@arborgardensolutions.co.uk
http://www.arborgardensolutions.co.uk
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR
Before you commence the assembly process, we recommend that you read these instructions
thoroughly beforehand to familiarise yourself with the assembly process and to also check that you
have the correct components. If for any reason you need assistance, you can find our contact details at
the top of the page of these instructions.
We highly recommend that any assembly is carried out on a flat, level surface if possible and that you
use another person to assist you if necessary
Ensure that you have all the correct parts listed on the front page of these instructions, including any fixings.
It's important to note that while mobile field shelters are designed for fields, which often have some degree
of unevenness, it's still beneficial for them to be placed on as level ground as possible.
Package contents
4x slides
L1-L2 (side) panels
R1-R2 (side) panels
B1-B2 (back) panels
FR-FL-FT (Front) panels
F-L, F-R, F-M Roof triangles
F-L, F-M Roof covers
Roof design endboard
Roof front featheredge cover
board
14x Rafters
Roof panels
Roof corners (B-R, B-L, F-R, F-L)
Roof middle covers
Roof end design covers
4x Feather edge covers
Necessary screws and fixings
Kickboards
Metal braces for towing the
shelter
Guttering kit (If purchased one)
Apex field shelter assembly
for your convenience all guide holes are pre-drilled.
Press here for the assembly video
Tools required
An electric screwdriver (No.2 Pozi bit) or
Screwdriver.
Hammer
Handsaw
Ladder

Advertisement

loading
Need help?

Need help?

Do you have a question about the Animal field shelter V.6 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Arbor Technology Animal field shelter V.6

  • Page 1 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Apex field shelter assembly Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarise yourself with the assembly process and to also check that you have the correct components.
  • Page 2 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 1 Step 2 Take two of the smaller slides and place them on two of the After securing all 4x corners measure both diagonals they longer slides as shown in the picture, before securing it with must be the same length to continue your assembly.
  • Page 3 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 5 Step 6 Now take the second half of the back panel B2 and place it on Now take panel R1 and secure it in the same manner as top of the first securing it with the 6x 70mm coach screws as panel L1.
  • Page 4 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 9 Step 10 Now take the Front top panel FT and place it on your assembly Place the front panels FR and FL as shown in the picture make securing it with the 8x 70mm coach screws.
  • Page 5 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 13 Step 14 Repeat the same procedure for the "F-L" triangle on the left Locate the middle triangle labeled F-M. At the back of the side.
  • Page 6 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 17 Step 18 For each roof cover (both "F-L" and "F-R"), secure them in Take the two roof covers marked "F-L" and "F-R." Position the place using six 80mm wood screws.
  • Page 7 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 21 Step 22 Take the roof front featheredge cover board. Align the Add the roof rafters to the shelter, ensuring alignment with the pointy end of the cover board with the roof structure, as triangle dividers.
  • Page 8 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 25 Step 26 Position the roof panels on top of your assembly, ensuring they Keep putting on the rest of the roof panels making sure that cover the entire shelter structure.
  • Page 9 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 29 Step 30 Place the middle roof covers in position, ensuring they are You will be provided with the finish design board to cover the aligned in the middle of the shelter and effectively cover the gap in the shelter.
  • Page 10 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 33 Attach the metal braces to the corners that are convenient for you using 4x coach screws for each brace. If you have purchased your shelter with the front guttering, please proceed with the following steps (A to I) Fixing Guttering Step A Step B...
  • Page 11 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step C Step D Secure the other end of the gutter pipe with the provided Take the assembled gutter pipe, which includes both ends end attachment, as shown in the picture securely attached with the appropriate fittings.
  • Page 12 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step G Step H Attach one end of the longer pipe securely to the current Attach one end of the remaining long pipe securely to your structure, positioning it to face the shelter's front.
  • Page 13 Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Animal field shelter V.6 open front/apex roof is now completed! We hope that you found your product quick and easy to assemble but if not and you require further assistance or have any questions you can contact us via the details above.