Download Print this page

Arbor Technology Alleyway shed Build Instructions

Advertisement

Quick Links

Phone number: 01945 410950
support@arborgardensolutions.co.uk
http://www.arborgardensolutions.co.uk
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR
Before you commence the assembly process, we recommend that you read these instructions
thoroughly beforehand to familiarise yourself with the assembly process and to also check that you
have the correct components. If for any reason you need assistance, you can find our contact details
on the top of the page of these instructions.
We highly recommend that any assembly is carried out on a flat, level surface if possible and that you
use another person to assist you if necessary
We cannot stress the importance of putting your new Arbor Garden Solutions building onto a solid,
flat, level foundation enough. Get it right, and your building will fit together perfectly and last for
years. Get it wrong, and you could have problems with assembly. The shed will not last nearly as
long, and the doors may not close properly. Your local retailer may be able to offer a base-laying
service or recommend someone who can.
Package contents
L1-L2 (side) panels
R1-R2 (side) panels
TL-TB (Front top triangle panels)
2x F1; 2x F2 panels
3x Rafters
4x Feather edge covers
2x Top Edging strips
2x Shorter roof frame planks
2x Longer roof frame planks
2x Narrower roof OSB sheets
2x Wider roof OSB sheets
2x Roof felt sheets
Doors (Optional)
Necessary screws and fixings
Base frame
Base sheet
Alleyway shed build instructions
for your convenience all guide holes are pre-drilled.
Tools required
Electric screwdriver (No.2 Pozi bit) or
Screwdriver

Advertisement

loading
Need help?

Need help?

Do you have a question about the Alleyway shed and is the answer not in the manual?

Questions and answers

Summary of Contents for Arbor Technology Alleyway shed

  • Page 1 Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Alleyway shed build instructions Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarise yourself with the assembly process and to also check that you have the correct components.
  • Page 2: Base Assembly

    Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Important information While assembling, ensure that when aligning each panel, the shiplap is sticking out of the frame. This step is crucial to achieve a proper fit and ensure the shed's stability. Base assembly Step A Step B...
  • Page 3 Step 1 Step 2 Find a flat and level surface to assemble your alleyway shed. Place Next, take the L2 panel and carefully position it on top the base panel on this surface. Then, position the L1 panel on top of of the previously installed L1 panel.
  • Page 4 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 5 Step 6 Next, take the R2 panel and position it directly above the Proceed by taking the R1 panel and positioning it just like the L1 R1 panel.
  • Page 5 Phone number: 01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 9 Step 10 Proceed to secure the TL Front top triangle panel from the Take three of the rafters and align them with the cross members inside of the shed.
  • Page 6 OSB panels and the roof the roof frame and rafters that were attached previously. This will frame. firmly attach the OSB panels to the frame, providing a strong and stable roof for your alleyway shed.
  • Page 7 To secure the doors in place, use 40mm wood screws to attach the door hinges to the shed frame. Alleyway shed is now completed! We hope that you found your product quick and easy to assemble but if not and you require further...