Summary of Contents for Arbor Technology Triple Bay log store
Page 1
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Generic build instructions – Triple Bay log store Before you commence the assembly process, we recommend that you read these instructions thoroughly beforehand to familiarise yourself with the assembly process and to also check that you have the correct components.
Page 2
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 1 Step 2 Arrange the 2 spacer blocks on the ground (the Stand the left-hand end panel (or right hand orientation is not critical), adjacent to the end for the reversed roof version) upright on a panel as shown in the photo above.
Page 3
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Attach the panel to the post by screwing Rearrange the spacer blocks and offer up the through the batten using 65mm screws as next panel, aligning and attaching it as before. before.
Page 4
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Attach the base to the end panel front post first, Now attach the base to the end panel rear post using 1 of the 85mm screw and then secure the using one more 85mm screws rear post in the same way.
Page 5
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Secure the rear of the roof using 65mm screws as Carefully place the roof on top of the end panel shown. posts ensuring that the batten ends sit flush with the posts as shown.
Page 6
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 17 Step 18 After making sure that the gap at the bottom is Make sure that the centre post sits flush the same as in the top attach the centre post to with the roofs batten ends and secure in the base panel with the provided 1x 80mm place with 1 of the 65mm screws.
Page 7
01945 410950 support@arborgardensolutions.co.uk http://www.arborgardensolutions.co.uk Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Step 21 Step 22 Secure the top hinge in place using more of Align the top hinge in place, ensuring that the black hinge screws. Repeat steps 20 - 22 the gap between the door and post is for any further doors as required.
Page 8
Trading address: Unit 11, Cattle Dyke, Wisbech, England, PE1 34NR Your triple bay log store is now completed! We hope that you found your product quick and easy to assemble but if not and you require further assistance or have any questions you can contact us via details above.
Need help?
Do you have a question about the Triple Bay log store and is the answer not in the manual?
Questions and answers