Installing The Module - D-Link xStack DGS-3426P User Manual

Layer 2 gigabit ethernet managed switch
Hide thumbs Also See for xStack DGS-3426P:
Table of Contents

Advertisement

xStack DGS-3400 Series Layer 2 Gigabit Ethernet Managed Switch

Installing the Module

Unplug the Switch before removing the faceplate covering the empty slot. To install the module, slide it in to the available slot at
the rear of the Switch until it reaches the back, as shown in the following figure. Gently, but firmly push in on the module to
secure it to the Switch. The module should fit snugly into the corresponding receptors.
Figure 2- 22. Inserting the optional module into the Switch (DGS-3450)
Now tighten the two screws at adjacent ends of the module into the available screw holes on the Switch. The upgraded Switch is
now ready for use.
Figure 2- 23. DGS-3450 with optional DEM-410X module installed
14

Advertisement

Table of Contents
loading

Table of Contents