Mounting The Switch In A Standard 19" Rack; Power On; Power Failure - D-Link xStack DGS-3426P User Manual

Layer 2 gigabit ethernet managed switch
Hide thumbs Also See for xStack DGS-3426P:
Table of Contents

Advertisement

xStack DGS-3400 Series Layer 2 Gigabit Ethernet Managed Switch

Mounting the Switch in a Standard 19" Rack

Power On

1. Plug one end of the AC power cord into the power connector of the Switch and the other end into the local power source
outlet.
2. After powering on the Switch, the LED indicators will momentarily blink. This blinking of the LED indicators represents
a reset of the system.

Power Failure

As a precaution, in the event of a power failure, unplug the Switch. When power is resumed, plug the Switch back in.
Figure 2- 18. Installing Switch in a rack
11

Advertisement

Table of Contents
loading

Table of Contents