Download Print this page

Advertisement

Quick Links

Warranty.
Installation and Maintenance Technical Manual
1
APE Cerámica S.L.U.
C/ Luxemburgo, 46
12006 Castellón (Spain)
Tel.: (+34) 964 340 434
Fax: (+34) 964 255 606
apegrupo@apegrupo.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the Xlining and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for APE Xlining

  • Page 1 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Warranty. Installation and Maintenance Technical Manual Tel.: (+34) 964 340 434 Fax: (+34) 964 255 606 apegrupo@apegrupo.com...
  • Page 2: Warranty

    APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) APE Grupo – Warranty and XLINING Installation and Maintenance Technical Manual Index Presentation of the group and purpose of the manual XLINING Presentation. 2.1.1 Product description 2.1.2 Formats and thicknesses 2.1.3 Uses 2.1.4 Tones and directionality...
  • Page 3 XLINING ceramic plates are highly versatile and can be used in a efficient and durable application of the material. wide range of applications: •...
  • Page 4 Benefit: they ensure durability and a long service life, being resistant to shocks and falls of heavy objects. In summary, ape grupo’s XLINING sheets offer a high quality Stain resistance technical and aesthetic solution, with rigorous control over...
  • Page 5 2.2.1 Packaging (boxes and metallic easel) and facilitating efficient handling of the product. 2.2.2. Arrangement of large-format porcelain XLINING offers two different types of packaging depending on the size and thickness of the porcelain tile: tile slabs on the truck...
  • Page 6 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) • Use of spacers: and adequate for maneuvering the necessary equipment. Friction prevention: use spacers between sheets to avoid friction and possible scratches during transport. • Required equipment: • Load securing: Cranes or hoists: to lift large format plates safely.
  • Page 7 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Advantages: they provide a firm grip without the need • Preparation of the work area: to drill or damage the surface of the plate. Make sure the area is clear and clean.
  • Page 8: Installation

    APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) To avoid fatigue and risk of injury, take regular breaks. • Electric diamond blade cutter Rotate personnel if many plates need to be handled or • Water saw for porcelain tile if working conditions are particularly difficult.
  • Page 9 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) 2.3.2 Placement as cladding Drilling procedures • Preparation: 2.3.2.1 Interior cladding Precisely mark the point where the drilling is to be The installation of large format porcelain tile as an interior performed.
  • Page 10 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) desired design. Assistant: consider having an assistant to handle large format plates, as they are heavy and difficult to handle Calculation of cuts: consider the necessary cuts for alone. corners, sockets and other interruptions.
  • Page 11 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Planning and measurement Water-powered cutters are recommended to avoid dust and get cleaner cuts. • Measurement • Final adjustment: Step 1: Measure the total area to be coated to calculate the amount of material needed.
  • Page 12 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) A complete step-by-step guide to this process is provided following the size of the planks to facilitate alignment below. during installation. Materials and tools required Step 2: make a preliminary design on the floor, placing the planks in the desired pattern to adjust cuts and •...
  • Page 13 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Finishes that requires precision, proper preparation and attention to detail to ensure a durable and aesthetically pleasing finish. The • Adhesive cleaning: following is a detailed step-by-step guide to perform this task correctly.
  • Page 14 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Step 2: Follow the manufacturer’s instructions to Step 1: Measure and mark the sheets that need to be ensure proper application and drying time. cut to fit edges, corners or other special areas.
  • Page 15 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Step 2: Avoid using abrasive cleaners that may damage • Serrated spatula (preferably 10-12 mm). the surface of the porcelain tile. • Electric tile cutter with water. • Revision of seals: •...
  • Page 16 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Step 2: Determine the starting point and mark a base Step 2: Use an electric tile cutter with water to make line using a laser or spirit level to ensure correct precise, clean cuts.
  • Page 17 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) exposure to dust and chemicals. professional finish. Here is a complete guide to perform this task effectively: • Traffic conditions: wait the appropriate time (according to the adhesive manufacturer) before allowing foot traffic Materials and tools required over the new coating.
  • Page 18 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Step 2: switch to 120 grit sandpaper and then to 220 between the planks to maintain even spacing. grit sandpaper to smooth and polish the edges until Step 2: Check for constant levelness with a laser or they are smooth to the touch.
  • Page 19 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Troubleshooting common problems • Tape measure and marking pencil. • Unleveling: • Leveling system for tiles. Cause: surface not properly leveled. • Edge profile for countertops (optional). Solution: make sure the surface is perfectly level •...
  • Page 20 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Song preparation • Filling and polishing of joints: • Sanding of edges: Step 1: Fill the joints between the slabs with porcelain tile grout or epoxy grout. Use a putty knife to ensure a Step 1: After cutting the sheets, use an electric or uniform finish.
  • Page 21 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Final considerations • Leveling system for tiles (optional). • Storage of materials: keep the porcelain tile sheets and • Edge profiles for doors (optional.) adhesive stored in a dry place until use.
  • Page 22 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) • Edge finish: surfaces with a damp sponge before drying. Step 1: If you want a more professional finish, use Step 2: Check the joints and make sure they are clean abrasive polishing discs for a polished and shiny edge.
  • Page 23 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Solution: work in small sections and mix the adhesive • High Performance Cementitious Adhesive C2TE: in manageable quantities to avoid drying before Example: Laticrete 254 Platinum application. Characteristics: high adhesion, high resistance to •...
  • Page 24: Cleaning And Maintenance

    APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) Features: high precision, clear horizontal and vertical • Installation conditions: avoid working in extreme weather lines. conditions and make sure the surface is properly prepared. • Tile leveling system: • Safety: wear personal protective equipment at all times to avoid accidents and injuries.
  • Page 25 APE Cerámica S.L.U. C/ Luxemburgo, 46 12006 Castellón (Spain) • Cleanliness: • Drying: Step 3: Dip a soft cloth or microfiber mop into the Step 8: Dry the surface with a soft, dry cloth to prevent cleaning solution and wring it out well.
  • Page 26: Warranty And Certifications

    APE CERAMICA S.L.U. will replace the surface of the porcelain tile. defective product with an equal one, reserving the right, at APE CERAMICA S.L.U.’s discretion, to make cash refunds, limited •...
  • Page 27 • Damage and breakage caused by improper handling or APE CERAMICA S.L.U. reserves the right to visit the site, on a storage by the customer or carrier. previously agreed date, to examine the product and verify the •...