APE upon SUBSTITUTION OF ANY PARTS WHATSOEVER, inspection to have been defective in USE OF PARTS NOT APPROVED BY APE OR ANY material or workmanship. Such parts ALTERATION OR REPAIR BY OTHERS IN SUCH A shall be provided at no cost to the user, at MANNER AS, IN APE’S JUDGMENT, AFFECTS THE...
Page 5
Refer to schematic diagrams and the BOM (Bill of Materials) for component part specifications and recommended spare parts. When calling APE (American Piledriving Equipment), always inform them of the supplied serial # in order to obtain quicker service. Read this manual thoroughly before operating and / or working on the equipment.
This manual covers the 100 WICK DRAIN installation, maintenance and use. The data provided in this manual gives the necessary information to operate and maintain APE equipment. The listed procedures are to be performed by qualified personnel who have an understanding of the equipment and who follow all safety precautions.
GENERAL INFORMATION Model 100 Wick Drain Overview The APE Model 100 BOTTOM DRIVE WICK INSERTER is a vibratory wick drain inserter. Designed to insert wick drain by forcing a wick threaded mandrel into wet soil while vibrating through tough soil.
Wick Drain Checklist Prior to Shipment * Items checked with an asterisk should be checked regularly, but not every time the unit is serviced Checking the suppressor Tips for the APE service technicians and pile crew: □ Removed all wire rope for insurance reasons □...
12. If there are any questions about the weights, specifications, or performance of the unit, contact APE before handling or operating the equipment. 13. If the equipment is to be used for anything other than inserting plumb wick drains, contact APE before using the unit.
Page 15
33. Keep hands away from vibrator suppressor during operation. Clearances may change causing pinch points. 34. When driving “batter” wick drain insure that the lead system, and crane boom, have sufficient bending strength to handle the worst case load. Consult APE. Page 13...
Mandrel Template P/N: 352017 to align and properly space the sections. All rigging of either the inserter must be done in accordance with standard rigging guide lines set forth in ASTM standards; APE does not assume responsibility for incorrect rigging or procedures.
The vibrator circuit is controlled by the tool circuit. Use caution when bleeding any hydraulic lines, even low hydraulic pressure can cause injury to personnel. EXCAVATOR CONNECTION Contact APE Certified Service Techincian for more information RETURN LINE AUX #1 RETURN...
Page 21
MAINTENANCE & TROUBLESHOOTING Severe Conditions Oil Recommendations The gearbox lubricant installed by APE during The servicing intervals are specified on normal manufacturing is Schaefer 268. If it is unavailable operation conditions. Operation under severe an alternative oil may be used when changing conditions require shorter service intervals.
Shipment A tag with identifying numbers for the unit. If the shipment recipient and method of shipment isn’t stated then APE will use its own judgment. Shortages APE does not assume responsibility for any delay, damage, or loss of material while in transit.
Page 35
RECOMMENDED BOLT TIGHTENING TORQUE “LUBRICATED SHCS” Socket Head Cap Screws When installing any APE equipment or parts apply lubricant and use APE standard Anti-Seize torque specs. See Tightening Torque Spec below. Failure to follow tightening torque spec can result in under / over tightening fasteners, leading to equipment failure or personal injury.
Page 38
All information given in this Manual is current and valid per the information available at the time of publication. (Please check the updated revision date at the bottom of each page.) American Piledriving Equipment (APE) reserves the right to implement changes without prior notice.
Need help?
Do you have a question about the 100 WICK DRAIN and is the answer not in the manual?
Questions and answers