Download Print this page
Better Bathrooms ASTW1800 User Manual

Better Bathrooms ASTW1800 User Manual

Aster-vertical corner traditional radiator

Advertisement

Quick Links

ASTW1800 ASTA1800
V1-.08.01.24

Advertisement

loading
Need help?

Need help?

Do you have a question about the ASTW1800 and is the answer not in the manual?

Questions and answers

Summary of Contents for Better Bathrooms ASTW1800

  • Page 1 ASTW1800 ASTA1800 V1-.08.01.24...
  • Page 2 ASTW1800 3330 ASTA1800 3330...
  • Page 3 Wall bracket Silicone Gasket Masonry Wall Plug Long Screw O-ring Airvent Blanking plug 12,5 27,5 315±1.5% block flow...
  • Page 4 Safety Notice: Prior to drilling into walls, check there are no hidden electrical wires,cables or water supply pipes. Always wear protective equipment such as safety glasses and hearing protection whilst using power tools. Tools for installation (not supplied) Before Installa�on, please read this guide carefully. A fully qualified and competent person should install this product.
  • Page 5 Position the towel rail in desired location, check for level and mark four equal positions for the brackets. Make sure the radiator is installed vertically. Allow enough room for the installation of valves and or thermostatic controls Before installation place a dust sheet on the floor to prevent losing any small parts.
  • Page 6 fixings can be purchased from your local DIY store. fixings can be purchased from your local DIY store.
  • Page 7 Wrap PTFE tape around blanking plug and bleeder valve and screw into top of radiator tighten with a spanner. Apply PTFE tape to valves and screw into bottom of radiator tighten with a spanner.
  • Page 8 Rest radiator onto bracket and connect valves to household supply. “The product includes a flow block to improve circulation, this must be fitted at the bottom, as shown in the Technical drawing”. “Inlet valve and outlet valve, must also be fitted to the bottom”...

This manual is also suitable for:

Asta1800