Acer Altos R5250 Series User Manual page 135

Acer altos r5250 server: users guide
Hide thumbs Also See for Altos R5250 Series:
Table of Contents

Advertisement

4
Install the server into the rack.
Caution! To avoid personal injury, care should be taken when
pressing the inner rail release latches and sliding the component
into the rack.
(1) Carefully align the inner rails attached to the server with the
fully extended mounting rails on the rack.
(2) Press the release latch on both sides of the server (A).
(3) Insert the inner rails into the mounting rails, then push the
server into the rack until you hear a click sound (B).
(4) Secure the server to the rack using two metal screws (C).
117

Advertisement

Table of Contents
loading

Table of Contents