Download Print this page
Crosswater US-M10FCS Installation Instructions

Crosswater US-M10FCS Installation Instructions

Teardrop petite bathtub

Advertisement

Quick Links

Teardrop Petite Bathtub
US-M10FCS
Installation Instructions
Introduction
This bathtub has been fully inspected throughout the production
process and only leaves our factory after a 15-step QC process.
Don't remove the old fixture before you unpack and inspect the new
bath tub.
Carefully remove the bathtub from the box, taking care the bathtub is
carried in the bag and check that all parts have been supplied.
Before beginning installation of the bath ub please check for any
damage that may have occurred during transport. Note: Damage
claims cannot be made during or after installation.
Improper installation shall result in loss of warranty in case of damage
caused by impacts or rubbing against rough surfaces.
Prior to installing the bathtub prepare a connection of water inlet/outlet.
Pay attention to leveling of floor where the bathtub will be located,
ensuring it can take the weight of the bathtub, water and bather(s).
The customer may choose the type and location of the faucets,
installation instructions should be supplied by the faucet manufacturer.
The installation procedure of the bathtub may differ from that
described in the installation instructions, depending on where you
wish the bathtub to be located.
Wet surface of the bathtub may create a risk of slipping which may
increase by using soap, shampoo, oils and similar products.
IMPORTANT: Please read these instructions carefully before you
begin and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
RECOMMENDATIONS:
It is recommended that walls and floor are fully tiled and finished before
installation, this ensures that the product is installed flat to the tile face
and allows product to be easily removed if required in the future.
It is recommended to remove the protective packaging after
installation of the bathtub.
It is recommended to only fill the bathtub with water up to 2/3 of
its height.
It is recommended to use US-CW12 and ITD5135 waste flow
products with this bathtub.
Tools required
Tape
measure
Safety
Set
glasses
square
Installation notes
NOTES: The installation must comply with all plumbing codes including
local codes and be installed by a licensed plumbing contractor.
Store the bathtub in a safe place until you begin installation to avoid
any damage.
Assemble the bathtub on a mat to protect against damage to the bath
tub surface.
Avoid getting cement, grit, sand or masonry products on to the surface.
Protect and cover the bathtub during the installation period to
prevent damage from occurring.
Never use brown tape or gaffer tape directly on to the surface. If the
bath has to be repacked remember to avoid taping directly on to the
surface of the bathtub.
INSTALLATION: Remember to turn off the main water supply before
connecting to any existing pipe work or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric
or otherwise before drilling holes in a wall or floor.
Dimensions
2/3 Height = 50 Gal./190L
Weight - 148lbs
Weight with water - 567lbs
32-3/8"
19-3/4"
Pencil
Spirit
level
66-3/4"
2" dia
28-3/4"
35-1/2"
Silicone
sealant

Advertisement

loading
Need help?

Need help?

Do you have a question about the US-M10FCS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Crosswater US-M10FCS

  • Page 1 Teardrop Petite Bathtub US-M10FCS Installation Instructions Introduction Installation notes This bathtub has been fully inspected throughout the production NOTES: The installation must comply with all plumbing codes including local codes and be installed by a licensed plumbing contractor. process and only leaves our factory after a 15-step QC process.
  • Page 2 • Water temperature should not exceed 49°C/120°F indicated for this purpose. Warranty - All Crosswater London products come with a limited lifetime warranty. For full details, terms and conditions visit our website. For further information contact: Crosswater London, 393 Fortune Blvd., Milford, MA 01757 www.crosswaterlondon.com...