Crosswater MPRO66 Installation Instructions

Bathtub with integral overflow

Advertisement

MPRO66 Bathtub
with Integral Overflow
PRO66-WH
Installation Instructions
Introduction
This bathtub has been fully inspected throughout the production
process and only leaves our factory after a 15-step QC process.
Unpack and inspect the bathtub before removing the fixture being
replaced, if applicable.
Carefully remove the bathtub from the box, taking care the bathtub is
carried in the bag. Check that all parts have been supplied.
Before beginning installation of the bathtub please check for any
damage that may have occurred during transport. Note: Damage
claims cannot be made during or after installation.
Improper installation shall result in loss of warranty in case of damage
caused by impacts or rubbing against rough surfaces.
Prior to installing the bathtub prepare a connection of water inlet/
outlet.
Pay attention to leveling of floor where the bathtub will be located,
ensuring it can take the weight of the bathtub, water and bather(s).
The customer may choose the type and location of the faucets,
installation instructions should be supplied by the faucet
manufacturer.
The installation procedure of the bathtub may differ from that
described in the installation instructions, depending on where you
wish the bathtub to be located.
Wet surface of the bathtub may create a risk of slipping which may
increase by using soap, shampoo, oils and similar products.
IMPORTANT: Please read these instructions carefully before
beginning and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
RECOMMENDATIONS:
- Walls and floor should be fully tiled and finished before installation.
This ensures that the product is installed flat to the tile face and allows
the product to be easily removed in future, if required.
- Remove the protective packaging after installation of the bathtub.
- Only fill the bathtub with water up to 2/3 of its height.
- Use US-CW20-WH waste flow products with this bathtub.

Tools required

Tape
measure
Safety
Set
glasses
square

Installation notes

The installation must comply with all plumbing codes including
local codes and be installed by a licensed plumbing
contractor.
Store the bathtub in a safe place until you begin installation to avoid
any damage.
Assemble the bathtub on a mat to protect against damage to the bath
tub surface.
Avoid getting cement, grit, sand or masonry products on to the surface.
Protect and cover the bathtub during the installation period to
prevent damage from occurring.
bath has to be repacked remember to avoid taping directly on to the
surface of the bathtub.
IMPORTANT: Turn off the main water supply before connecting to
any existing pipe work or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric

Dimensions

Weight - 293lbs
Weight with water - 937lbs
2/3 Height = 77 Gal./293L
31 1/2"
22 1/4"
Pencil
Spirit
level
15 3/4"
2"
66 1/2"
2 1/2"
22 1/2"
52 3/8
Silicone
sealant

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MPRO66 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Crosswater MPRO66

  • Page 1 MPRO66 Bathtub with Integral Overflow PRO66-WH Installation Instructions Introduction Installation notes The installation must comply with all plumbing codes including This bathtub has been fully inspected throughout the production local codes and be installed by a licensed plumbing process and only leaves our factory after a 15-step QC process.
  • Page 2 Warranty - This Crosswater London product is covered by a limited lifetime warranty. For full details, terms and conditions please visit our website. For further information contact: Crosswater London, 393 Fortune Blvd., Milford, MA 01757 www.crosswaterlondon.com...

This manual is also suitable for:

Pro66-wh

Table of Contents