Download Print this page
Crosswater Patinato Petite Installation Instructions

Crosswater Patinato Petite Installation Instructions

Advertisement

Quick Links

Patinato Petite Bathtub
US-N3ACS
Installation Instructions
Introduction
This bathtub has been fully inspected throughout the production
process and only leaves our factory after a 15-step QC process.
Don't remove the old fixture before you unpack and inspect the new
bathtub.
Carefully remove the bathtub from the box, taking care the bathtub is
carried in the bag.
Before beginning installation of the bathtub please check for any
damage that may have occurred during transport. Note: Damage
claims cannot be made during or after installation.
Improper installation shall result in loss of warranty in case of damage
caused by impacts or rubbing against rough surfaces.
Prior to installing the bath tub prepare a connection of water inlet/outlet.
Pay attention to leveling of floor where the bathtub will be located,
ensuring it can take the weight of the bathtub, water and bather(s).
The customer may choose the type and location of the faucets,
installation instructions should be supplied by the faucet manufacturer.
The installation procedure of the bathtub may differ from that
described in the installation instructions, depending on where you
wish the bathtub to be located.
Wet surface of the bath ub may create a risk of slipping which may
increase by using soap, shampoo, oils and similar products.
IMPORTANT: Please read these instructions carefully before you
begin and retain for future reference.
We do not accept responsibility for any problems that may occur
through incorrect installation.
RECOMMENDATIONS:
- Walls and floor should be fully tiled and finished before installation.
This ensures that the product is installed flat to the tile face and allows
the product to be easily removed if required in the future.
- Remove the protective packaging after installation of the bathtub.
- Only fill the bathtub with water up to 2/3 of its height.
- Use US-BTW0231 and ITD5135 waste flow products with this
bathtub.
Tools required
Tape
measure
Safety
Set
glasses
square
Installation notes
The installation must comply with all plumbing codes including local
codes and be installed by a licensed plumbing contractor.
Store the bathtub in a safe place until you begin installation to avoid
any damage.
Assemble the bathtub on a mat to protect against damage to the
bathtub surface.
Avoid getting cement, grit, sand or masonry products on to the surface.
Protect and cover the bathtub during the installation period to
prevent damage from occurring.
Never use brown tape or gaffer tape directly on to the surface. If the
bath has to be repacked remember to avoid taping directly on to the
surface of the bathtub.
IMPORTANT: Turn off the main water supply before connecting to
any existing pipe work or doing any maintenance.
WARNING! Please check for any hidden pipes and cables, electric
or otherwise, before drilling holes in a wall or floor.
Dimensions
2/3 Height = 44 Gal./167L
Weight - 187lbs
Weight with water - 555lbs
27-1/4"
25-1/2"
Pencil
Spirit
level
2" dia
59-7/8"
2-1/4"
47-3/8"
Silicone
sealant

Advertisement

loading
Need help?

Need help?

Do you have a question about the Patinato Petite and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Crosswater Patinato Petite

  • Page 1 Patinato Petite Bathtub US-N3ACS Installation Instructions Introduction Installation notes This bathtub has been fully inspected throughout the production The installation must comply with all plumbing codes including local process and only leaves our factory after a 15-step QC process. codes and be installed by a licensed plumbing contractor.
  • Page 2 Installation - carriage IMPORTANT: This bathtub is VERY heavy and installation requires 3 people. Crosswater London cannot accept responsibility for any injuries caused to those attempting to install this bathtub without adequate and appropriate tools or resources. l Remove the bathtub from the packaging area using the bag with handles.
  • Page 3 Installation - preparation lUnder floor access is required for plumbing of bathtub waste l Waste connection is dependant on the site situation. • It is recommended that ITD5135 be used for ease of Final decision about installation of waste connection should be installation.
  • Page 4 Warranty - This Crosswater London product is covered by a limited lifetime warranty. For full details, terms and conditions please visit our website.. For further information contact: Crosswater London, 393 Fortune Blvd., Milford, MA 01757 www.crosswaterlondon.com...