Installation - Slee CRYOSTAT MEV Operating Manual

Routine cryostat
Hide thumbs Also See for CRYOSTAT MEV:
Table of Contents

Advertisement

7.3 Installation

To open the chamber, slide the window to the top.
Remove the transport security underneath the specimen holder and position the waste tray.
Wait at least 4 hours before switching on the device (especially if you are not sure that the device was not tilted). Failure to
comply may result in severe damage to the device.
The device is supplied with a condensate water collecting
container, which must be installed before the device is put
into operation.
First mount the metal bracket for the condensate water
container on the right side of the device. Loosen the screws
and hang the bracket onto the screws. Now tighten the
screws.
Place the condensate water container in the metal holder
and connect the condensate water pipe and the level sen-
sor to the device.
i
18
It is crucial to install the sidewards condensate water container, otherwise there may be icing on
the evaporator! We recommend filling the container with 500 ml disinfectant before initial op-
eration.
After installation, wait at least 4 hours before switching on the device. Failure to comply may
result in severe damage to the device.
Installation of the metal bracket for the condensate water collector.
Connection of the condensate water pipe
and the level sensor to the device.
Manual_MEV_MEV+_2024-06-001.00_EN.docx

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CRYOSTAT MEV and is the answer not in the manual?

This manual is also suitable for:

Cryostat mev+

Table of Contents