6. Initial operation
6. Initial operation
22 / 88
Versions with RS-485 connection have an internal DIP
switch. Both DIP switches are in the ON position in the
factory version.
1. Unpack the RouterNode.
2. Check the RouterNode for damage.
3. Screw the antenna onto the FME socket (wireless
versions only).
4. Make sure that the power supply complies with the
technical data (see
[
23]
).
}
5. Connect the network cable or the RS-485 cable.
6. Connect the power supply.
The LED lights up in green.
9
7. Start up the RouterNode with the WaveNet Man-
ager and LSM.
LSM displays the network ID (Group ID/Member
9
ID) in the window "Administer WaveNet node".
9
RouterNode ready for use.
RouterNode GatewayNode
Technical specifications
EN
Need help?
Do you have a question about the RouterNode and is the answer not in the manual?
Questions and answers