Eden CH500 Instruction Manual

Aluminum carport 503lx305wx207h/232hcm

Advertisement

Aluminum carport
Instruction manual
SIZE:503Lx305Wx207H/232Hcm
28/06/2020
IMPORTANT
You must read these instructions carefully before you start to assemble this Aluminum carport .Please ensure
that you find all parts.
in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly.
Please carry out the steps in the order set out in these instructions.
Do not tighten the steps in the Aluminum carport until completing on the assembly.
Keep these instructions in a safe place for future reference.
CH500

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CH500 and is the answer not in the manual?

Questions and answers

Summary of Contents for Eden CH500

  • Page 1 Aluminum carport Instruction manual SIZE:503Lx305Wx207H/232Hcm CH500 28/06/2020 IMPORTANT You must read these instructions carefully before you start to assemble this Aluminum carport .Please ensure that you find all parts. in the carton box in the correct type and quantity as mentioned in the list illustrated in every page accordingly.
  • Page 2: Safety Advice

    SAFETY ADVICE TOOLS & EQUIPMENT REQUIRED We strongly recommend the use of work gloves during assembly. Protective Equipment: Do not attempt to assemble the Aluminum carport in windy or wet conditions, Do not touch overhead power cables with the aluminum profiles. 1.Helmet Always wear shoes and safety goggles when working with extruded aluminum.
  • Page 3: Product Size

    PRODUCT SIZE Make sure a good installation location OTHER CAUTIONS CH500 1. 3 people required, one is for measuring & taking marks to ensure the installation dimension ,the second person is responsible for the installation and the last one do as assistant and assure the safety.
  • Page 4 CH500 PARTS LIST SCREW SKELETON NO. Qty. NO. Qty. NO. Qty. 2918mm B9HL 2506mm 2506mm B9HR 1468mm 2086mm B5LL B9LL 1468mm B5LR B9LR 2086mm 1468mm B5HL 2086mm B5HR 2100mm 2200mm SCREW NO. Qty. NO. Qty. POLYCARBONATE PANEL F8-1 20...
  • Page 5 Install schematic diagram of Alu.frames B9HR B5HL B9HL B4 B6 B5LL B9LL B9LR B5HR B9HR B8 B8 B9HL B9LL B9LR B5LR B8 B8 It's lower here. Note that the rain will flow to it.
  • Page 6 "hexagonal screw" SUMMARY STATEMENT FOR POLYCARBONATE PANEL installation Place the "hexagonal screw"into the groove,turn clockwise until it stops turning. Adjust the "hexagonal screw"by hand and twist so threads fix it in place. Place other parts on "hexagonal screw"and assemble nut . Towards the white film side to the sun as it is UV-protected.
  • Page 7 8 x2 B15 x1 F3 x2 2-1 x2 F4 x4 Ⅰ Ⅱ Ⅲ Ⅳ 1460±3mm 1460±3mm...
  • Page 8 8 x6 B15 x6 B7 x2 F3 x12 F4 x6 Ⅱ 1460±3mm Ⅰ Ⅲ...
  • Page 9 B6 x12 B4 x4 F4 x24 Ⅲ Ⅵ Ⅴ Ⅶ Ⅵ Ⅰ Ⅴ Ⅴ Ⅳ Ⅶ Ⅴ Ⅱ Ⅰ Ⅲ Ⅱ Ⅳ Ⅴ...
  • Page 10 5-1 x2 B11 x2 F7 x4 F1 x8 5 x1 Ⅱ Ⅰ WD-40 WD-40 Ⅱ Ⅰ WD-40 F1 will be easy to install by using lubricants -10-...
  • Page 11 3-1 x4 B10 x4 B3 x4 F9 x16 3 x2 Silicon Silicon Ⅰ Ⅱ -11-...
  • Page 12 Ⅱ Ⅰ 180° F3 x32 Ⅲ -12-...
  • Page 13 POLYCARBONATE PANEL POLYCARBONATE PANEL -13-...
  • Page 14 5-1 x2 B11 x2 F7 x4 F1 x8 5 x1 Ⅰ Ⅱ WD-40 WD-40 WD-40 F1 will be easy to install by using lubricants -14-...
  • Page 15 6-1 x4 S9 x4 F4 x8 Silicon -15-...
  • Page 16 6 x2 B12 x4 Silicon WD-40 WD-40 -16-...
  • Page 17 B5LR B5HR B5LL B5HL F3 x12 B5HL B5HR B5LL B5LR -17-...
  • Page 18 Silicon Silicon Silicon Silicon Recommendation: use silicone to fill the gap. -18-...
  • Page 19 9-1x2 F8-1 x6 2100mm B9LR x2 B9LL x2 B8 x4 F8 x6 Ⅰ (NO.B9LL) is different from (NO.B9HL) and 2100mm cannot be mixed. Ⅱ B9LL B9LR F8-1 F8-1 -19-...
  • Page 20 F8-1 x6 2200mm B8 x4 B9HL x2 B9HR x2 F8 x6 Ⅰ (NO.B9LR) is different from (NO.B9HR) and 2200mm cannot be mixed. Ⅱ B9HL B9HR F8-1 F8-1 -20-...
  • Page 21 F8-1 x8 F9 x8 B1 x8 F8-1 -21-...
  • Page 22 F9 x8 B9LR B9LR B9LL B9LL Ⅰ B5LR B9LL B9LR B9LR -22-...
  • Page 23 B9HR B9HL F9 x8 B9HR B9HL Ⅰ B5LR B9HR B9HL B9HL -23-...
  • Page 24 F6 x16 S7 x24 7 x2 S8 x16 WD-40 If the (NO.F6) expansion screw does not fit well with the ground, use the following method: 1. Dig a 400x400mm depth 400mm pit on the ground 2. The concrete is poured into the pit at a position of 200mm, waiting for the concrete to solidify safely.
  • Page 25: Frame Maintenance

    Maintenance: In a timely manner the centralizer skeleton. 1.If the ground not level off, loose soil layer thickness is differ, Aluminum carport may tilt to one end, once found, should be timely the centralizer, in case of deformation. The shed may be slant when facing the un-level ground or loose soil layer, please righting the shed urgently to avoid deformation 2.Prevent increased loading-weight artificially.

Table of Contents