Download Print this page
Symphony SYM-417 Setup Instructions

Symphony SYM-417 Setup Instructions

Portable counter

Advertisement

Quick Links

© 2024
Order #XXXXX
Item
Qty.
Description
--
2
16.732"h aluminum Leg (lower)
--
2
16.732"h aluminum Leg (lower w/ Velcro)
--
2
16.732"h aluminum Leg (upper)
--
2
16.732"h aluminum Leg (upper w/Velcro)
--
1
30"w x 21.5"d Counter Base
--
1
30"w x 21.5"d Counter Shelf
1
30"w x 21.5"d Counter Top
Assemble unit upside-down.
wing
nuts
Velcro
Velcro
Velcro
Velcro
Note: Velcro must face front of assembled counter.
SYM-415 Portable Counter
Steps:
Note: Assemble counter upside-down.
1) Attach upper legs to underside of Counter Top. Twist to tighten.
2) Connect lower Legs through Counter Shelf to upper Legs, as shown.
3) Place Counter Base over lower Legs & secure with wing nuts.
4) Turn counter unit over & affix fabric graphic to assembly using Velcro.
Counter Base
Velcro
Lower Legs
straight edge faces back
Counter Shelf
Counter Shelf
Upper Legs
Velcro
Counter Top
TOP VIEW
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at info@classicexhibits.com
When assembled
Velcro
Velcro
Velcro
Graphic
Wrap
Velcro
Velcro

Advertisement

loading
Need help?

Need help?

Do you have a question about the SYM-417 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Symphony SYM-417

  • Page 1 © 2024 Order #XXXXX SYM-415 Portable Counter Item Qty. Description Steps: 16.732”h aluminum Leg (lower) Note: Assemble counter upside-down. 16.732”h aluminum Leg (lower w/ Velcro) 16.732”h aluminum Leg (upper) 1) Attach upper legs to underside of Counter Top. Twist to tighten. 16.732”h aluminum Leg (upper w/Velcro) 2) Connect lower Legs through Counter Shelf to upper Legs, as shown.
  • Page 2 © 2024 Order #XXXXX General Information General Setup Instructions WARNING - Read entire setup instruction manual prior to unpacking parts and pieces. - The setup instructions are created specifically for this configuration. - Setup instructions are laid out sequentially in steps, including exploded views with detailed explanation for assembly.
  • Page 3 © 2024 Order #XXXXX Case Packing Top View of Each Level Setup Legs Hardware Counter Floor Shelf Graphic Legs Level 1 Level 2 Level 3 Level 4 (Bottom level) Case 1 of 1...

This manual is also suitable for:

Sym-415