Summary of Contents for Allen + Roth HAVERHILL TJ-0113V3622BR
Page 1
Black Marble Top Haverhill Vanity With Top Combo Weathered Oak Finish Engineered TJ-0113V3622GR Black Marble Top ALLEN + ROTH and logo design are trademarks I TEM #5287405, 5288057 or registered trademarks of LF, LLC. All rights reserved. 36" HAVERHILL VANITY WITH TOP...
TABLE OF CONTENTS Package Contents.......................3 Safety Instructions......................3 Preparation.........................4 Assembly or Installation Instructions...................4 Care and Maintenance......................8 Warranty..........................8 Replacement Parts List......................9 Optional-Remove Top......................11...
PACKAGE CONTENTS PART DESCRIPTION QUANTITY Vanity Vanity top Backsplash SAFETY INSTRUCTIONS Please read and understand this entire manual before attempting to assemble, operate or install the product. WARNING Unpacking requires two adults and several steps are more easily handled with two adults.
PREPARATION Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list. If any part is missing or damaged, do not attempt to assemble the product. Estimated Installation Time: 20-30 minutes (24 hours for silicone caulk to dry). Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors, silicone caulk, power drill with drill bit.
Page 5
INSTALLATION INSTRUCTIONS Adjusting the shelves Remove the shelf screws securing the shelf to the shelf bracket. Remove the shelf from the cabinet. Insert the shelf pins into the desired holes. Ensure that all the shelf pins are level. Gently insert the shelf into the vanity and secure it to the shelf pins using the shelf screws.
Page 6
INSTALLATION INSTRUCTIONS Removing the door (optional) Slide the door in the middle where two brackets could pass throw two holes under the top metal rail. Gently lift up the door, take bottom of door out of the bottom metal rail first, then take the whole door out.
Page 7
INSTALLATION INSTRUCTIONS 5. Installing the Backsplash Apply silicone to the back and one long edge of the Backsplash (C). Place the Backsplash (C) on the vanity (A). Be sure to align the Backsplash (C) with the top (B) of the vanity (A). Allow the silicone to dry before using the vanity.
CARE AND MAINTENANCE Dust the vanity regularly with a soft, non-lint producing cloth or household dusting product. You can clean the vanity with a gentle, non-abrasive household cleaner. Make sure to dry the wood immediately with a soft cloth or towel. The stone top can be cleaned using standard marble cleaning agents available at your local supplier.
REPLACEMENT PARTS LIST FOR # TJ-0113V3622BR For replacement parts, call our customer service department at 866-439-9800, 8 a.m. - 8 p.m., EST, Monday - Sunday. You could also contact us at ascs@lowes.com. PART DESCRIPTION PART# Backsplash TJ-0113V3622-BL Door (Brown) TJ-0113V3622-D (BR) Drawer box (Brown) TJ-0113V3622-DB (BR) TJ-0113V3622-AS (BR)
Page 10
Adjustable leveler TJ-0113V-AL Slider sub-assembly TJ-0113V-SA TJ-0113V-DB Door bracket TJ-0113V-PC Plastic covering TJ-0113V3622-TMR Top metal rail TJ-0113V-SS Shelf support with screw Printed in Vietnam ALLEN + ROTH and logo design are trademarks or registered trademarks of LF, LLC. All rights reserved.
OPTIONAL-REMOVE TOP Pull out the top drawer. 2. Take out the top. Sketch Pull the doors in the middle then take out the screws. Wood screws...
Page 12
OPTIONAL-REMOVE TOP Reinstalling the existing top. Place back the top on the vanity. Tighten these screws.Pull the doors back its place *Note:When vanity top is preinstalled. 4. Install the top drawers.
Need help?
Do you have a question about the HAVERHILL TJ-0113V3622BR and is the answer not in the manual?
Questions and answers