Single-Function Reset Button - NETGEAR GS728TXPv3 Hardware Installation Manual

24-port and 48-port gigabit ethernet poe+ smart switches with 4 sfp ports or 4 10g sfp+ ports and optional remote/cloud management
Table of Contents

Advertisement

24-Port and 48-Port Gigabit Ethernet PoE+ Smart Switches with 4 SFP Ports or 4 10G SFP+ Ports
Table 3. Supported transceiver modules and direct attach cables (Continued)
Model
Description
AGM732F
NETGEAR 1000BASE-LX SFP LC Transceiver (single mode, 10km 9/125μm)
1G Copper SFP Transceiver
AGM734
NETGEAR 1000BASE-T SFP RJ45 Transceiver
10G SFP+ Direct Attach Cables (DAC)
AXC761
NETGEAR 10G SFP+ to SFP+ 1-Meter Passive Direct Attach Cable
AXC763
NETGEAR 10G SFP+ to SFP+ 3-Meter Passive Direct Attach Cable
10G Fiber SFP+ Transceiver
AXM761
NETGEAR 10GBASE-SR SFP+ LC Transceiver (multimode, 550m OM4, 300m OM3 50/125μm,
33m OM2/OM1 62.5/125μm)
AXM762
NETGEAR 10GBASE-LR SFP+ LC Transceiver (single mode, 10km 9/125μm)
AXM763
NETGEAR 10GBASE-LRM SFP+ LC Transceiver (multimode, 220m 62.5/125μm)
AXM764
NETGEAR 10GBASE-LR LITE SFP+ LC Transceiver (single mode, 2km 9/125μm)
10G Copper SFP+ Transceiver
AXM765v2
NETGEAR 10GBASE-T, SFP+ RJ45 Transceiver
CAUTION:
On model GS728TXPv3, only ports 25 and 27 support 10G copper
modules; On model GS752TXPv3, only ports 49 and 51 support 10G copper
modules. If you insert a 10G copper module in an upper SFP+ port, do not insert
any module in the SFP+ port just below it. If you insert 10G copper modules in
the two upper SFP+ ports, do not insert any modules in the two lower SFP+ ports.
For more information about NETGEAR SFP and SFP+ transceiver modules and cables,
visit netgear.com/business/products/switches/modules-accessories.

Single-function Reset button

The switch provides a single-function Reset button on the front panel so that you can
restart the switch. We recommend that you save the configuration before you press the
Reset button.
To restart the switch:
1. Insert a device such as a straightened paper clip into the opening.
2. Press the recessed Reset button for more than one second.
During the restart process, the Power LED lights yellow.
Hardware Overview
20
Hardware Installation Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs728tppv3Gs728tpv3Gs752tpv3Gs752tppv3Gs752txpv3

Table of Contents