8

LPG INSTRUCTIONS

8.1
RELATED DOCUMENTS
BS 6798
BS EN 12828
BS 5446
BS 5440
PARTS 1 & 2 FLUES & VENTILATION
BS 6891
8.2
TECHNICAL DATA
Gas Pressures
Inlet pressure
Heating maximum gas rate (kg/hr)
Minimum gas rate (kg/hr)
Injector size
CO2 @ maximum output (%)
CO2 @ minimum output (%)
CO @ maximum output (ppm)
CO @ minimum output (ppm)
Slow ignition (rpm)
CH maximum number of fan rotation (rpm)
Mimum number of fan rotation (rpm)
NOTE
Please refer to 3 - 3E and use the appropriate PPE when
carrying out any of the actions or procedures contained within
this section.
8.3

GAS CONVERSION

Conversion from the gas of one family to the gas of another family
can be done easily even when the boiler is already installed.
This operation must be carried out by professionally qualified
personnel. The boiler is designed to operate with methane gas
(G20) or LPG (G31) according to the product label. The boiler
can be transformed to LPG or to methane gas (G20) by means
of special kits.
For disassembly refer to instructions below:
ƒ disconnect the boiler from the electricity supply and turn off
the gas tap
ƒ remove the casing as explained in paragraph "4.6 CASING
REMOVAL"
ƒ release the instrument panel and rotate it forwards
ƒ unscrew the pipe nut from the gas valve and rotate the pipe
so as to have access to the gas nozzle (B) in the outlet fitting
ƒ remove the nozzle (B) and replace it with the one from the
kit
ƒ put the pipe of the gas valve back in place and screw the nut
ƒ reposition the previously removed components
ƒ power up the boiler and open the gas tap again.
Adjust the boiler as explained in paragraphs "5.18 Adjustments"
and "5.19 Gas valve calibration".
b
Conversion must be carried out by qualified personnel
b
After the transformation, apply the new gas rating
plate included in the kit.
b
After each intervention on the adjustment element
of the gas valve, seal it with sealing varnish.
36
INSTALLATION OF BOILERS OF RATED INPUT NOT EXCEEDING 60 kW
DESIGN FOR WATER-BASED HEATING SYSTEMS
INSTALLATION OF GAS HOT WATER SUPPLIES FOR DOMESTIC PURPOSES
SPECIFICATION FOR THE INSTALLATION AND MAINTENANCE OF LOW
PRESSURE GAS INSTALLATION PIPEWORK OF UP TO 35 mm
VIBE MAX 20S
37.0 mbar
1.55
0.39
3.6 mm
10.0
10.0
140
30
5.500
6.900
2.050
B
Fig. 19
VIBE MAX 25S
37.0 mbar
1.94
0.39
3.8 mm
10.0
10.0
150
20
5.500
6.800
1.700
8.4
COMPLETION
On completion of the combustion analysis check and/or any gas
valve adjustment, see paragraph "5.17 Combustion analysis").
Remove the test probe from the test point and refit the sealing
screw/s and/or cap.
IMPORTANT
A GAS TIGHTNESS CHECK MUST BE CARRIED OUT IF ANY
GAS CARRYING COMPONENTS HAVE BEEN REMOVED,
REPLACED OR DISTURBED.
ATTENTION
Gas type and appliance output must be set according to the
specific appliance specification. Vokèra accepts no responsi-
bility if the gas type is not correctly adjusted according to the
respective appliance specification as detailed on the appliance
data badge.