DAIKIN
Date:
Model Number:
Serial Number:
Technician:
D
Verify all packaging material has been removed.
D
Remove all shipping brackets per installation instructions.
D
Verify the job site voltage agrees with the unit serial plate.
D
Verify condensate connection is installed per installation instructions.
D
Verify proper clearance around the unit for safety, service, maintenance and proper unit operation.
D
Verify proper weatherproofing of all ductwork, roof curbs and electrical connections.
D
Check that the flue screen is in place.
D
Check refrigerant piping for rubbing and leaks. Repair if necessary.
D
Check unit wiring to ensure it is not in contact with refrigerant piping or sharp metal edges.
D
Check all electrical connections and terminals. Tighten as needed.
D
Verify that the crankcase heaters have been energized for 24 hours.
D
Verify the scroll compressor(s) are rotating in the right direction.
D
Verify all accessories are installed and operating correctly.
D
Check filters and replace if necessary.
D
Verify the installation of the thermostat.
Location:
Unit#:
Pre Start-Up
(Check each item as completed)
57
Start-up Checklist
*Store in job file
9/1:014