Commissioning - Bosch RT 800 Installation Instructions Manual

Hide thumbs Also See for RT 800:
Table of Contents

Advertisement

Commissioning

Removing the user interface
1. Press the knob on the underside of the plinth.
2. Pull the bottom of the user interface forward.
3. Remove the user interface by lifting upward.
t
Ü b e rs ic h
, 1 0 .0 8 .2
1
D ie n st ag
1 4 : 5 0
6 0 %
2 0 °
1.
Fig. 8
Removing the user interface
4
Commissioning
▶ First make all electrical connections professionally and
then perform commissioning.
▶ Observe the installation instructions for all components
and assemblies in the system.
▶ Only switch on the power supply after all modules are
coded.
▶ Set the heat source to the maximum supply temperature
required and activate automatic mode for DHW heating.
▶ Switch on the system.
If a fault occurs during commissioning:
A11/1036
Ok
A11/1036
A1/1036
1.
PDF
Fig. 9
▶ Contact and consult the manufacturer.
▶ Send the RT 800 to the manufacturer or dispose of.
6
3.
2.
0010041893-001
2.
A11/1036
Ok
0010041093-001
4.1
Commissioning
Commissioning is mainly carried out automatically. Only a little
data has to be entered.
Language
1. Heating circuit (heating circuit 1 - 4) with room
temperature measurement
2. Heating circuit (heating circuit 1 - 4 or no heating circuit)
Date and time if necessary
During initial commissioning, you can change between the
displays using the < and> keys. After commissioning, the
heating circuit allocation can be checked in the menu-specific
setting Heating circuit of the Heating or 2nd heating circuit
menus. If an incorrect heating circuit allocation is carried out,
the RT 800 must be reset to factory settings and the initial
commissioning must be carried out again (Chapter 4.2).
After establishing the power supply, the language selection
appears on the display.
Commissioning
Language
English
Change
▶ Using the / and . keys, select the desired language and
confirm with OK.
The display changes to the heating circuit setting.
Maximum 4 heating circuits may be present in the heating
system. Up to 2 heating circuits can be allocated to the RT 800.
▶ Using the / and . keys, select the heating circuit desired
(1 ... 4) and confirm with OK.
▶ Using the / and . keys, select the further heating circuit
desired or No assignment and confirm with OK.
If a time and date is already present in the BUS system,
commissioning is finished and the standard menu appears
on the display. Otherwise the display changes to the setting
for date and time.
▶ Using the / and . keys, select date (Year/Month/Day)
and time (Hours/Minutes) and confirm each with OK:
The display shows the standard menu.
Confirm: OK
0010041326-003
RT 800 – 6721838942 (2023/01)

Advertisement

Table of Contents
loading

Table of Contents