Mechanical Installation
Cylindrical plastic
bubble spirit level
3
The steps of mounting battery modules, BMS and inverter are same as the floor-
mounting's. Please refer to Chapter 3.
4
30
26.5 lbf.in / 3.0 N·m
x 4
x 4
For solid wood wall
For concrete wall
M5
8.8 lbf.in /
1.0 N·m
5. Wiring Connection on the Inverter
AC cable
A: L1 terminal
B: L2 terminal
C: N terminal
PV cable
A,C and E: PV+ terminal
B, D and F: PV- terminal
Wiring Connection on the Inverter
ABC
12–8 AWG (for GWU-HYB 3.8 DH)
10–8 AWG (for GWU-HYB 5.0 DH /
6.0 DH / 7.6 TH)
0.47 in / 12 mm
Wirings
A
B
C
D
E
F
2 MPPTs(for GWU-HYB 3.8 DH / 5.0
DH / 6.0 DH)
3 MPPTs (for GWU-HYB 7.6 TH)
10-8 AWG 0.47 in / 12 mm
31
Wirings