Download Print this page

GreenWorks PowerHub GWU-GreenE SYSTEM Quick Installation Manual page 15

Advertisement

Mechanical Installation
5
Secure the BI
on the wall
6
26
Hang the BI
on the bracket
10
mm
26.5 lbf.in /
3.0 N·m
Drill a hole in the back (Not recommended)
1
2
Mechanical Installation
Corresponds to
the holes below
the perforated paper
Drill the hole with
a hole cutter.
Choose 1 inch or 2inch size
(Metal chips must be cleaned after drilling)
27

Advertisement

loading