Bosch 830 ES Installation And Operating Instructions Manual page 38

Hide thumbs Also See for 830 ES:
Table of Contents

Advertisement

Installation instructions
Once connections are made, check for gas leaks at all joints.
Apply some gas leak detection solution to all gas fittings.
Bubbles are a sign of a leak. A combustible gas detector may
also be used to detect for leaks.
DANGER:
Explosion hazard!
▶ If you detect a leak, shut off the gas. Tighten appropriate
fittings to stop leak. Turn the gas on and check again with a
gas leak detection solution. Never test for gas leaks using a
match or flame.
GAS LINE SIZING
The gas supply piping for a single heater should be sized for a
maximum draw of 175,000 BTU/hr. Measure the length of gas
supply line from the building's gas main to the heater and use
the chapter 4.9.1 and 4.9.2, page 39 or the gas line
manufacturer's sizing tables to determine the pipe diameter
necessary. If there are more gas drawing appliances on the line,
size the gas line according to the total maximum amount of BTU
draw input rating of for all appliances combined.
Note: Undersizing the gas line may result in diminished hot
water flow rate and temperature. See chapter 4.14, page 46
for the procedure to measure gas pressure. Proper gas
pressure must be confirmed at time of installation.
38
830 ES – 6 720 644 936 (2021/08)

Advertisement

Table of Contents
loading

Table of Contents