Carrier 40MBFAQ Service Manual page 37

Floor console ductless system size 12k
Hide thumbs Also See for 40MBFAQ:
Table of Contents

Advertisement

40MBFAQ: Service Manual
IPM Continuity Check
1. Turn off the outdoor unit and disconnect the power supply.
2. Discharge the electrolytic capacitors and ensure the energy-storage unit(s) have been discharged.
3. Disassemble the outdoor PCB or disassemble the IPM board.
4. Measure the resistance value between P and U(V, W, N); U(V, W) and N.
DIGITAL TESTER
(+)Red
(-)Black
N
U
P
V
W
Manufacturer reserves the right to change, at any time, specifications and designs without notice and without obligations.
WARNING
WARNING
Electricity remains in capacitors even when the power supply is off.
Ensure the capacitors are fully discharged before troubleshooting.
Table 11 — Digital Tester
RESISTANCE VALUE
Several M
37
DIGITAL TESTER
(+)Red
(-)Black
U
V
N
W
-
RESISTANCE VALUE
Several M

Advertisement

Table of Contents
loading

This manual is also suitable for:

40mbfaq12xa3

Table of Contents