Page 2
Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Installation Sight Prep Prior to receiving the APITC's the sight will require the following accomodations: Location to connect two hospital grade duplex GFCI receptacles. Location to be in the green box shown below. All wiring is to be completed by a licensed electrician.
Page 3
Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Product Receiving The APITC will arrive at your requested location secured to a pallet that is approximately 49" long, 60" wide, and 50" tall. It will weigh approximately 650 lbs. Sizes and weights will vary based on configurations.
Page 4
Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Assembly Step 1 - Set base cabinet with steel toe kick in place. Remove all doors and drawers. Level the base cabinet using a flat head screw driver to adjust the four leveling feet attached to the steel base.
Page 5
Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Assembly Step 5 - Set the upper cabinet on top of the middle hutch and line up accent panels. Attach the upper cabinet to the middle hutch using the 6 provided 1.5" Allen drive bolts. The bolts enter through the upper cabinet and go down into the middle hutch.
Need help?
Do you have a question about the Perfetta and is the answer not in the manual?
Questions and answers