Download Print this page

Anthos Perfetta Installation Manual

Integrated treatment console

Advertisement

Quick Links

Anthos Perfetta Integrated Treatment Console
Installation Guide
Version 080822
Cover Page

Advertisement

loading
Need help?

Need help?

Do you have a question about the Perfetta and is the answer not in the manual?

Questions and answers

Summary of Contents for Anthos Perfetta

  • Page 1 Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Cover Page...
  • Page 2 Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Installation Sight Prep Prior to receiving the APITC's the sight will require the following accomodations: Location to connect two hospital grade duplex GFCI receptacles. Location to be in the green box shown below. All wiring is to be completed by a licensed electrician.
  • Page 3 Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Product Receiving The APITC will arrive at your requested location secured to a pallet that is approximately 49" long, 60" wide, and 50" tall. It will weigh approximately 650 lbs. Sizes and weights will vary based on configurations.
  • Page 4 Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Assembly Step 1 - Set base cabinet with steel toe kick in place. Remove all doors and drawers. Level the base cabinet using a flat head screw driver to adjust the four leveling feet attached to the steel base.
  • Page 5 Anthos Perfetta Integrated Treatment Console Installation Guide Version 080822 Assembly Step 5 - Set the upper cabinet on top of the middle hutch and line up accent panels. Attach the upper cabinet to the middle hutch using the 6 provided 1.5" Allen drive bolts. The bolts enter through the upper cabinet and go down into the middle hutch.