Preparing the pole operating shaft, continued
"Manual opening"
operation, continued
11- 2016
Installation
Installation of operating device
The table below gives the steps of "manual opening" operation :
Step
Action
3
Put back the blocking tool
(4) on the flange of the
sleeve (12).
NOTE : This tool ensure
the angular positioning of
pole operating shaft dur-
ing the coupling with the
operating mechanism.
4
Remove the lever (6).
5
Remove the safety plate (5)
and the screws from the
flange on the front of the
handle sleeve (12).