Before You Begin - GE Monogram Z1D910 Installation Instructions Manual

27" and 30" warming drawers
Table of Contents

Advertisement

Safety Information
BEFORE YOU BEGIN
Read these instructions completely and carefully.
. | M PO RTANT
— Save these instructions
for local inspector's use.
*IMPORTANT - observe all governing
codes and ordinances.
« Note to Installer — Be sure to leave these
instructions with the Consumer.
« Note to Consumer — Keep these instructions
with your Owner's Manual for future reference.
¢ Completion Time — 1 to 3 hours.
* Proper installation is the responsibility
of the installer. Product failure due to improper
installation is not covered under the warranty.
See Owner's Manual for warranty information.
« Use this appliance only for its intended purpose.
¢ Check with local utilities for electrical codes that
apply in your area. Local codes vary. Installation
electrical connections and grounding must
comply with applicable codes. In the absence
of local codes, the drawer should be installed
in accordance with National Electrical Code
ANSI/NFPA 70-1990 or latest edition.
AWARNING
This appliance must be properly grounded.
See "Grounding the Appliance."
For Monogram local service in your area,
1.800.444.1845.
For Monogram Service in Canada,
call 1.800.561.3344.
For Monogram Parts and Accessories,
call 1.800.626.2002.
If you received a damaged warming drawer,
you should contact your dealer.
AWARNING
An anti-tip brace must be installed to prevent
the drawer from tipping forward when opened
and loaded. Failure to do so could result in
personal injury.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Monogram zkd910

Table of Contents