IBM System/36 5360 Manual page 109

Setting up your computer
Table of Contents

Advertisement

-
Select the 8809 Tape option (the option number of the 8809
Tape on display 01) and then press the
key.
Display 41 appears:
41
SYSTEM/
36 CHECKOUT PROGRAM
saog
Tape
-
- - - -
-
- -
- -
- - -
--This line appears only if you have a second tape
,
,
------------
-
------
--
drive connected to the f irst t ape drive.
~~~::
·
~
·
::
:~:!:~~::----------------
Lo1d a scratch
tape
on Drive '1
'
and
press
ENTER/
REC ADY
key to begin test
i
ng
.
Pres
s
ENTER/
REC ADV key to continue
Press SYS
REQ/
ATTN key to return to select ion eenu
Do the following steps to make sure the 8809 Tape Drive 1 is
ready to be tested:
1.
The 8809 Tape Drive
1
is set
up and a scratch
tape loaded.
(Use
t
he blank tape that was sent w ith your 8809
Tape
Drive.
After you complete checkout for the 8809 Tape Drive,
store the tape in a safe place for possible future use.)
2
.
The top cover of the 8809 Tape Drive 1 is
down.
3
.
The 8809 Tape Drive
1
Ready light is on
.
Checking Out Your System
97

Advertisement

Table of Contents
loading

Table of Contents