2. Remove an appropriate length of the jacket and insulation layer from the AC output power
cable using a wire stripper. (Ensure that the jacket is in the maintenance compartment.)
a. Three-core cable (excluding the ground cable) b. Four-core cable (including the ground cable)
Core
wire
L2=L1+3 mm
L1
≤ 230 mm
3. Crimp an OT terminal.
Insulation layer
Core wire
4. Connect the AC output power cable to the terminal block, and then tighten the nut using a
torque wrench that has an extension rod.
Ensure that AC terminations provide firm and solid electrical connections. Failing to do so may
cause SUN2000 malfunction and damage to its terminal block, even starting thermal events.
If the AC output power cables are subject to a pulling force because the inverter is not installed
stably, ensure that the last cable that bears the stress is the PE cable.
a. Three-core cable (excluding the ground
cable)
Insulation
layer
Jacket
Heat
gun
L1
Heat shrink
tubing
Hydraulic pliers
b. Four-core cable (including the ground cable)
9
L2=L1+3 mm
≤ 230 mm