VADO INDIVIDUAL OMIKA NOIR IND-T148/2-OMI-PB Installation Manual

3 way thermostatic shower valve

Advertisement

Quick Links

VADO
Wedmore Road, Cheddar,
Somerset, England BS27 3EB
tel 01934 744466
fax 01934 744345
www.vado.com
sales@vado.com
OMIKA NOIR
3 way thermostatic shower valve
INSTALL ATION GUIDE
Version 1, 1-7-21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the INDIVIDUAL OMIKA NOIR IND-T148/2-OMI-PB and is the answer not in the manual?

Questions and answers

Summary of Contents for VADO INDIVIDUAL OMIKA NOIR IND-T148/2-OMI-PB

  • Page 1 OMIKA NOIR 3 way thermostatic shower valve VADO Wedmore Road, Cheddar, Somerset, England BS27 3EB tel 01934 744466 fax 01934 744345 www.vado.com INSTALL ATION GUIDE sales@vado.com Version 1, 1-7-21...
  • Page 2 Important - please read Contents of Packaging Please read these instructions carefully before starting installation and keep for future reference. Remove all packaging and check the product for missing parts or damage before starting installation. Any alterations made to this product and fittings may infringe water regulations and will invalidate the guarantee.
  • Page 3 Dimensions Installation - Quick guide 90mm 242mm 40mm ¾" ¾" 80mm 80mm 250mm...
  • Page 4 Installation - Quick guide Installation Valve Mortar guard Rinse pipe work thoroughly before fitting the valve. Warning! Please check for any hidden cables and pipes before drilling holes in the wall. The valve must be set into the wall between (75mm minimum – 100mm maximum) If you are fitting the valve to a partition wall or a wall of particularly soft substrate you will need specialist fixings.
  • Page 5 Installation Installation Mortar Connect hot supply to the lower right Outlet Cold guard inlet of the valve and cold supply to the upper right inlet. Connect the outlets to the desired channels e.g. outlet 1 to the shower, outlet 2 to the handset and outlet 3 to the bath.
  • Page 6 Installation - handles Temperature resetting Temperature handle (middle) Handle stop at 12 o’clock Ensure the temperature handle is correctly located with the handle stop at Splines 12 o’clock. Carefully slide the handle onto the splines of the valve and then screw the shroud part to the valve whilst holding the handle part.

Table of Contents