Return And Discharge Duct Flanges; Pre Installation Unit Preparation; Corner Cap Installation Instructions - Bosch Greensource CDi Series Installation, Operation And Maintenance Manual

Table of Contents

Advertisement

12 | Return and Discharge Duct Flanges

RETURN AND DISCHARGE DUCT
FLANGES
Return and discharge opening duct flanges are shipped
unfolded. Flange bend lines are perforated allowing easy
bending using standard sheet metal pliers or channel
locks. (Figure #34)
Bend flanges one at a time.
Figure # 34

PRE INSTALLATION UNIT PREPARATION

Corner Cap Installation Instructions

Only on HZ Units
Each corner cap is stamped with one of the following
identifiers: T, T1,T2 B, B1, B2, A.
Corner cap installation is only applied to HZ units.
VT and CF units do not require corner cap
installation
1.
Identify Letter code on each corner cap. (Figure#35)
Figure # 35
2.
In preparation for installation identify each corner
cap location. (Figure#36)
Ensure cabinet surface is clean and free of debris to
ensure proper corner cap Adhesion.
8733942411 (2017/07)
T2
A
T1
3.
Remove adhesive backing and install each corner
cap. (Figure#37 and#38)
Subject to change without prior notice
SM Series Heat Pump
A
Figure # 36
Figure # 37
Figure # 38
T2
A
T1
A
SM Series Heat Pump

Advertisement

Table of Contents
loading

Table of Contents