Winding/Unwinding The Cable; Lifting Loads; Maximum/Minimum Length Levers; Emergency Off Switch - Parkside 373100 2104 Operation And Safety Notes

Electric rope hoist
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
˜ Winding/unwinding the cable
(Fig . J)
Winding the cable: Press the control
 
switch
upwards according to the arrow
[
8 ]
indication .
Unwinding the cable: Press the control switch
 
downwards according to the arrow
[
8 ]
indication .
˜ Lifting loads
Lower the steel cable
 
comfortably .
Fasten the load to the hook
 
additional bungee cords where necessary .
The load's centre of gravity must be beneath
the product .
Wind up the steel cable
 
Then fully lift the load .
˜ Maximum/minimum length
levers
NOTE
The maximum/minimum length levers
u
are not intended to regularly stop the
16 ]
[
product . Always attempt to stop the product
before it triggers one of these levers .
Minimum cable length lever
When the steel cable
14 ]
[
minimum cable length lever
The steel cable cannot be wound up any further . It
can only be unwound .
Maximum cable length lever
When the steel cable
14 ]
[
maximum cable length lever
The steel cable cannot be unwound any further . It
can only be wound up .
so you can handle it
14 ]
[
. Use
10 ]
[
[
12 ]
until it is only taut .
14 ]
[
15 ]
[
is fully wound up, the
will be triggered .
[
15 ]
is fully unwound, the
will be triggered .
[
16 ]
˜ Emergency off switch
(Fig . J)
In case of an emergency, press the
 

emergency off switch

lowering operation .
The product is then locked . To unlock the
 
product, turn the emergency off switch
slightly clockwise (in the direction of the
arrow) until it pops out .
˜ Set-up as block and tackle
Accessories
The following tools are needed for the safe and
proper use of the block and tackle function:
2 spanners (8 mm)
 
2 spanners (13 mm)
 
WARNING
m
Do not use any accessories not
u
recommended by Parkside .
Setting up the product as a block and tackle
distributes the load to 2 pulleys . This allows twice
the weight to be lifted . However, the maximum
lifting height and speed are reduced by half .
Fasten the hook
12 ]
[
 
opening
. The steel cable
18 ]
[
loop (Fig . C) .
Dismantle the pulley
 
Remove the 3 screws (Fig . F) .
to stop lifting or
7 ]
[
7 ]
[
to the intended mounting
now forms a
14 ]
[
of the extra hook:
11 ]
[
GB
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Psz 250 a2

Table of Contents