Do not use the maximum/minimum length
levers
routinely as a stop mechanism .
[
15 ]
[
16 ]
These levers serve as a stop mechanism only
in emergencies .
Before you begin: Check whether
the steel cable
–
[
14 ]
around the drum
the space between coils is less than the
–
diameter of the cable itself (Fig . D) .
Before first use
Remove the packaging materials .
Remove the transport lock from the steel cable
. Cut the rubber band and remove it .
[
14 ]
Before you begin: Check whether
the steel cable
–
14 ]
[
around the drum
the space between coils is less than the
–
diameter of the cable itself (Fig . D) .
Make sure the steel cable
maximum/minimum length levers
properly and without touching them (Fig . B) .
10 GB
is wound properly
and whether
17 ]
[
is wound properly
and whether
17 ]
[
passes the
14 ]
[
15 ]
[
16 ]
[
Assembly
(Fig . E)
m
DANGER!
The square tube (cross sectional
u
dimensions: 45 x 45 mm) must be able
to bear a minimum load of 500 kg at
the points where the product is fastened .
It is recommended to consult qualified
personnel (for example a structural
engineer) for assembly .
Because special knowledge is required,
u
seek advice from a qualified technician to
ensure all screws are tightened fully and
correctly .
A qualified technician or a properly trained
u
person should also check the anchoring
of the square tube before the product is
fastened .
Time needed for assembly: approx . 1 hour
u
Fasten the product with the mounting brackets
and the mounting screws
[
1 ]
square tube .
Tighten the mounting screws
Operation
NOTE
The product has been outfitted with a
u
thermostat switch . During operation, it may
stop the motor
3 ]
[
started again once it has cooled down .
to a suitable
2 ]
[
.
2 ]
[
. The motor can be only