Panasonic U-8MF3R7 Installation Instructions Manual page 42

Hide thumbs Also See for U-8MF3R7:
Table of Contents

Advertisement

5. HOW TO PROCESS TUBING
The liquid tubing side is connected by a flare nut, and the gas
tubing side is connected by brazing.
5-1. Connecting the Refrigerant Tubing
Use of the Flaring Method
Many of conventional split system air conditioners employ the
flaring method to connect refrigerant tubes which run between
indoor and outdoor units. In this method, the copper tubes are
flared at each end and connected with flare nuts.
Flaring Procedure with a Flare Tool
(1) Cut the copper tube to the required length with a tube
cutter. It is recommended to cut approx. 30 – 50 cm longer
than the tubing length you estimate.
(2) Remove burrs at the end of the copper tube with a tube
reamer or a similar tool. This process is important and
should be done carefully to make a good flare.
Be sure to keep any contaminants (moisture, dirt, metal
filings, etc.) from entering the tubing.
Before
Deburring
After
Copper
tubing
Reamer
N OT E
When reaming, hold the tube end downward and be sure that
no copper scraps fall into the tube.
(3) Remove the flare nut from the unit and be sure to mount it
on the copper tube.
(4) Make a flare at the end of copper tube with a flare tool.
N OT E
A good flare should have the following characteristics:
● Inside surface is glossy and smooth
● Edge is smooth
● Tapered sides are of uniform length
42
Flare nut
Flare tool
Copper
tubing

Advertisement

Table of Contents
loading

Table of Contents