Trane 5TWR4 Installation And Operation Manual page 11

Table of Contents

Advertisement

11.2 Low Voltage Hook-up Diagrams
With 5TEM6
Thermostat
R
24 VAC HOT
G
FAN
24 VAC
B/C
Common
O
COOL/HEAT
Y
1st STAGE
HEATING
W1
1st STAGE
5)
W2
HEATING
2nd STAGE
1) Units with pigtails require wirenuts for connections.
2) Cap all unused wires.
3) When BK is used, do not connect Y2 at the air handler.
4) When BK is used, cut the jumper between R and BK on the
control board. See indoor wiring schematic for details.
5) In AC systems, for multiple stages of electric heat, jumper
W1 and W2 together if comfort control has only one stage of heat.
With Furnance
Evaporator Coil MCB
Thermostat
R
R
24 VAC HOT
G
G
FAN
B
24 VAC
B/C
Common
O
Y1
COOL
Y1
W1
HEATING
3)
W2
BK
BK
Mitigation Board Guidelines
The approved ID/OD combination will provide sufficient safe ventilation in case of a leak.
Refer to Indoor Unit Installer's Guide for correct specifications on indoor unit install.
All systems require mitigation boards so an altitude adjustment factor may be required.
Mitigation Control Board needs to be included in an A2L System.
18-BC117D1-1B-EN
With 5TEM4
Outdoor
Air Handler
Thermostat
Unit
R
R
24 VAC HOT
G
FAN
B
24 VAC
B
Common
Blue
O
O
Y1
COOL/HEAT
1st STAGE
3)
Y2
Yo
Y
W1
HEATING
1st STAGE
White
W2
HEATING
2nd STAGE
Pink
BK
WH/BLK
1) Units with pigtails require wirenuts for connections.
2) Cap all unused wires.
3) In AC systems, for multiple stages of electric heat, jumper W1
and W2 together if comfort control has only one stage of heat.
Furnance
R
R
G
G
B
B
O
Y1
Yi
3)
Yo
Y2
W1
W2
3)
BKi
BK
Outdoor
Air Handler
Unit
R
R
R
G
G
B
B/C
B
Blue
O
O
O
Y
Y1
Y2
Yo
Y
W1
W1
White
3)
W2
W2
Pink
1) Units with pigtails require wirenuts for connections.
2) Cap all unused wires.
3) In AC systems, for multiple stages of electric heat, jumper
W1 and W2 together if comfort control has only one stage of heat.
Outdoor
Unit
R
B
1) Units with pigtails require wirenuts for
connections. Cap all unused wires.
2) For 24V control, connect factory supplied
O
harness to circuit board at evaporator.
Complete all other wiring connections at the furnace.
3) For 2 stage systems, connect W2 to W2 and Y2 to Y2.
Y/Y1
3)
Y2
X2
With 5TAM5
Outdoor
Thermostat
Air Handler
Unit
R
R
R
24 VAC HOT
G
G
FAN
B
24 VAC
B/C
B
Common
Blue
O
O
O
COOL/HEAT
Y1
Y
1st STAGE
Y2
Yo
Y
HEATING
W1
W1
1st STAGE
White
3)
W2
HEATING
W2
.
2nd STAGE
Pink
W3
W3
HEATING
3rd STAGE
Brown
Brown
11

Advertisement

Table of Contents
loading

Table of Contents