Section 11. Electrical - Low Voltage - Trane 5TWR4 Installation And Operation Manual

Table of Contents

Advertisement

10.2 Open the Liquid Service Valve
Extreme caution should be exercised when opening the Liquid Line Service Valve. Turn counterclockwise until
the valve stem just touches the rolled edge. No torque is required. Failure to follow this warning will result in
abrupt release of system charge and may result in personal injury and /or property damage.
Important: Leak check and evacuation must be completed before opening the service valves.
STEP 1 - Remove service valve cap.
STEP 2 - Fully insert 3/16" hex wrench into the stem and back out counterclockwise until valve stem just touches
the rolled edge (approximately five (5) turns.)
STEP 3 - Replace the valve cap to prevent leaks. Tighten finger tight plus an additional 1/6 turn.
CAP
UNIT SIDE
OF VALVE
PRESSURE TAP PORT
Gas Service Valve

Section 11. Electrical - Low Voltage

11.1 Low Voltage Maximum Wire Length
Table 11.1 defines the maximum total length of
low voltage wiring from the outdoor unit, to the
indoor unit, and to the thermostat.
10
1/4 TURN ONLY
COUNTERCLOCKWISE
FOR FULL OPEN
POSITION
VALVE STEM
GAS LINE CONNECTION
!
WARNING
Unit Side
of Service
Service Port
Cap
3/16" Hex Wrench
Valve
Rolled Edge to
Captivate Stem
Liquid Service Valve
Table 11.1
24 VOLTS
WIRE SIZE
MAX. WIRE LENGTH
18 AWG
16 AWG
14 AWG
18-BC117D1-1B-EN
Hex Headed
Valve System
150 Ft.
225 Ft.
300 Ft.

Advertisement

Table of Contents
loading

Table of Contents