Page 2
0,99 m 0,25 m * 2,11 m 0,25 m 0,00 m 0,99 m * Vloerhoogte (Floor height) Benaming TOE BBP 161 2K Station 1 toren Title Tekening Opmerking Basic Play Drawing Comment BOER Datum Hoofdafmetingen Main dimensions 6-4-2016 Date SPEELTOESTELLEN...
Page 3
3,93 m Opvangzone Impact area Obstakelvrije zone Obstacle free zone Benaming TOE BBP 161 2K Station 1 toren Title Tekening Opmerking Basic Play Drawing Comment BOER Datum Obstakelvrije zone Obstacle free zone 6-4-2016 Date SPEELTOESTELLEN...
Page 4
1,57 m 0,80 m 1,57 m Grondmarkering Ground level marker 0,50 m Benaming TOE BBP 161 2K Station 1 toren Title Tekening Opmerking Basic Play Drawing Comment BOER Datum Bodemplan Groundplan 6-4-2016 Date SPEELTOESTELLEN...
Page 5
Geleverde modules: Supplied modules: Zie tabel See table Montageinstructie: Assembly instruction: - De hoofdmaten geven de maten van de staanders en vloeren aan - The main dimensions indicate the dimensions of the posts and floors - De detailtekeningen geven specifiek de maten van de verbindingen aan - The detailed dimensions show the specific dimensions of the connections - The modules which contain tubes are dimensioned at the top of the flanges - De modules met buizen zijn op de tekeningen bemaat op bovenkant kopplaat...
Page 6
2,11 m 0,70 m 0,25 m 0,00 m Voor (Front) 2,11 m 0,99 m 0,25 m 0,00 m Rechts (Right) Benaming TOE BBP 161 2K Station 1 toren Title Tekening Opmerking Basic Play Drawing Comment BOER Datum Afmetingen Dimensions 6-4-2016 Date SPEELTOESTELLEN...
Page 7
2,11 m 0,25 m 0,00 m Achter (Back) 2,11 m 1,00 m 0,25 m 0,00 m Links (Left) Benaming TOE BBP 161 2K Station 1 toren Title Tekening Opmerking Basic Play Drawing Comment BOER Datum Afmetingen Dimensions 6-4-2016 Date SPEELTOESTELLEN...
Page 8
LOGBOOK Type indication Article number BBPE161.2K Product Name Playhouse Fish store Construction year 2024 Manufacturer name Boer Speeltoestellen Hyacintstraat 2 - 4255 HX Nieuwendijk Phone: +31 (0)183 40 23 66 Fax: +31 (0)183 40 35 64 Installer name _______________________________________________________ _______________________________________________________...
Page 9
LOGBOOK Inspection and maintenance Date of Time of Name Name Parts to be inspection inspection executor of executor of Found defects replaced maintenance maintenance inspection maintenance Accidents Date Age of Measures taken Probable cause of injury Occurred injury accident victim after accident...
Inspection and maintenance intervals months Nr. Inspection Maintenance between inspections Verify equipment's stability, junctions and Add missing parts, secure joints, apply missing parts. Inspect bolts, screws and nuts for missing fixing agent and replace absence, jams, corrosion and wear. corroded parts. Replace worn parts and/or remove non- Check suspension for wear.
Page 11
7. Remember that bad maintenance leads to unsafe conditions and notably faster impoverishment of the playground area. 8. Replacement parts can be ordered at the manufacturer with the OEM part numbers on the module drawing. Drawings can be found in the user guide. 9.
Need help?
Do you have a question about the Playhouse Fish store and is the answer not in the manual?
Questions and answers