Sequence of Assembling
1
1) Assemble the Main PBA to the bracket.
3
1) Connect the 3 points FPCB connector to the
PBA.(Red points)
* P35x is add to blue point.(Total 5points)
Confidential and proprietary-the contents in this service guide subject to change without prior notice.
Distribution, transmission, or infringement of any content or data from this document without Samsung's written authorization is strictly prohibited.
2
1) Screw 2 points on the MAIN PBA(Blue circle)
2) Screw 2 points on the recharge jack SUS.
(Green circle)
3) Connect the BATT CONN(Red circle)
* Torque : 1.1 Kgf·cm / Torque
4
1) Attach the LCD FPCB tape.
* This sequence is only P35x.
7-3
Level 2 Repair