Power Supply Loading Guidelines
The supported configuration of the server requires a minimum of one power supply installed in
either slot P0 or slot P1. You can install a second, optional hot-swappable power supply to provide
1+1 capability. The left side (viewed from the rear of the chassis) hot-swappable power supply is
identified as P0, and the second hot-swappable power supply is identified as P1
CAUTION:
covered with the supplied metal filler panel. Failure to observe this caution can result in damage
due to overheating.
Install the hot-swappable power supply into the server before attaching the new power cord. Failure
to observe this caution can result in damage to the server.
Installing a Hot-Swappable Power Supply
To install a hot-swappable power supply on the front of the server, follow these steps:
1.
Remove the metal filler panel if necessary.
2.
Support the power supply with both hands, and slide it into the empty slot until it clicks into
place
(Figure
IMPORTANT:
panel.
14
Installing the System
When a second power supply is not used, the empty power supply slot must remain
3).
Ensure the power supply is flush with the adjacent power supply or metal filler
(Figure
3).