Yamaha GRIZZLY 550 2013 Owner's Manual page 121

Table of Contents

Advertisement

1. Cylinder head air bleed bolt
19. When coolant begins to flow out of the bolt
hole, tighten the cylinder head air bleed bolt to
the specified torque.
Tightening torque:
Cylinder head air bleed bolt:
10 Nm (1.0 m·kgf, 7.2 ft·lbf)
20. Start the engine and let it idle for ten minutes.
21. Rev the engine five times.
22. Pour the recommended coolant into the radia-
tor until it is full.
23. Stop the engine and allow it to cool. If the cool-
ant level has dropped after the engine has
cooled, add sufficient coolant until it reaches
the top of the radiator, and then install the ra-
diator cap.
24. Start the engine, and then check for coolant
leakage.
TIP
If any leakage is found, have a Yamaha dealer
check the cooling system.
25. Install the V-belt cooling duct, and then tighten
the clamp screw.
26. Install the footboard by installing the bolts and
nuts, and then tighten them to the specified
torques.
8-37
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yfm550de 2013Yfm550dhe 2013Yfm550pe 2013Yfm550phe 2013

Table of Contents