Check Items before
Installation
The IP addresses for
communication between the host
machine and equipment are set
automatically
1. Turn ON the main power switch of the host machine.
2. Set the value in the following service mode (Level 1)
to "3".
• COPIER > OPTION >INT-FACE > IMG-CONT
3. Exit from Service Mode.
4. Turn OFF the main power switch of the host
machine.
Securing space for installation
Be sure to secure the space for installing this equipment as
shown in the figure. The space of 200 mm or more from the
back of this equipment is necessary.
200mm or more
Check Item When Turning OFF
the Main Power
Check that the main power of the host machine is OFF.
1. Turn OFF the main power switch of the host
machine.
2. Check that the display in the Control Panel and the
lamp of the main power are turned off, and then
disconnect the power plug.
Equipment
Rear
Front
63
7. INSTALLATION PROCEDURE
Check When Connecting the
Power Plug to an Outlet
1. When connecting the power plug of this equipment to an
outlet, be sure to use an outlet of a system different from
that of the host machine.
2. Be sure to install this equipment near an outlet so that
the power plug can be disconnected right away in case
of emergency, and do not put anything around the power
plug.
Installation Outline Drawing