Download Print this page

Nintendo VS.-PAK Manual page 18

Hide thumbs Also See for VS.-PAK:

Advertisement

vs.
TABLE
PAK INSTALLATION PROCEDURE
I.
Instruction Label
(See
Illus.
1-4)
A.
Open table housing, remove
the four
(4)
nuts
holding
the
plexiglass instruction label
cover, and remove
the
plexiglass
cover.
B.
Remove old instruction label carefully and save
for
future
use.
C.
Remove paper backing strip
on new label and install.
D.
Replace plexiglass
cover.
II.
Dip Switch Settings Instruction Label
A.
Remove paper backing on label
and place on any unused
surface inside table housing.
(Remove old label
if
necessary.
Save
for
future use.)
III.
PPU ROM Kit
A.
Replace ROM's
and PPU's
as
shown in
VS.
Game Operation
Manual
IV.
Factory Recommended Dip Switch Settings
A.
Check
dip switch settings on p.c. board so they
match
the
factory recommended dip switch settings sheet.
(4)
9/85

Advertisement

loading