Procedure
17. Reconnect water connections
(1) Insert Pipe from CU HE in to Main
Water Control Valve and attach "C"
Clamp
(2) Insert Foam Covered Pipe into the
flow sensor and SS HE and attach with
"C" Clamps
(3) Insert ¼" Drain Pipe into CU HE and
Drain Port and attach with small "C"
Clamps
(4) Reconnect Freeze Prevention Heater
on ¼" Drain Pipe into the wiring
harness
18. Reinstall neutralizer
(1) Locate the 3 key holes inside case
(2) Locate the 3 knobs on the neutralizer
(3) Line up the knobs with the key holes
and pull down to secure neutralizer
Diagram
Page 13