Termix VX-IV - 3 Series DS Fully insulated
Pre hand over check list
Date:
48
26
10
38
9
41B
69
7
Description:
Connection connected correctly
All connections tightened
Primary system flushed, through flushing bypass
2 Strainers checked
Differential pressure controller adjusted
Clip on actuator removed
Wiring completed
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed
Correct pressure on secondary system
System properly vented
UFH stat mounted correctly on heating supply line
Safety valve checked and piped to drain
Heating temperature setting
Flushing bypass closed
Insulation has been remounted
28 | © Danfoss | DHS-SRMT/SI | 2022.11
M
4
20
48
14
9
A
31
Pos.
31
69
10
26
48
60
Unit No.:
Page
OK
10
9
18
20
20
14-15
20-21
17
18
22
4
22
7
19
Carried out by:
Remark:
LGB53080